My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-05-01 Bella Vista Bay Park Improvements
>
Addendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2011 1:53:05 PM
Creation date
6/17/2011 1:53:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bella Vista Park Improvements
Bid No. (xx-xx-xx)
11-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and so we need to repair that. Also, it is not in the plans but there are two (2) %-inch conduits that <br />must be placed for AT&T lines, from the right-of-way, the entryway to the pre-cast structure. The <br />plans are on Demand Star. We will be providing two (2) signed and sealed sets of plans to the <br />contractor so they can pull permits. If you need more plans for other agencies, just make the request <br />to the City and we will provide you with additional plans because you will need some for the City of <br />North Miami Beach. Outside of that, you are all welcome to the site to take a look at it and become a <br />little more familiar with it. There are a lot of elements that he is not going to discuss now that is part <br />of the plan, there is drainage in there, signage, landscaping, specialty items, etc. There is a statement <br />that he makes in Section 3 that says that this project is 100% turn key, it is a fairly simple project, it <br />is not complicated but what might complicate it may be DERM, we are in the process of getting the <br />first DERM application in and we are hoping to get their comments back. As soon as that becomes <br />available to him, and if it is available prior to your submittal, then he will post it on Demand Star. <br />For the comments that we received from the Building Department, there were not many, and so we <br />just made those adjustments in the plans that are now on Demand Star. <br /> <br />Director Batista opened the meeting to questions from the prospective bidders. <br /> <br />QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS <br /> <br />1. Regarding the two conduits, how long is the entryway to the structure? <br />You have to field verify. When you look at the plans you will see the structure, you will <br />see the roadway coming in and there is only one roadway that is adjacent to the site, <br />and so just calculate from that roadway up to the structure stub out and put the pull <br />strings in there. <br /> <br />2. Are specs going to be provided? <br />The specs are on the plans, the Architect provided a set of plans and a set of specs, and <br />he said all the specifications or all the information that is necessary to provide a <br />proposal is on the plan, that doesn't mean you are not going to have an RFI. If you <br />have an RFI he will be happy to answer it but take a look at the plans. Section 3 of the <br />Scope of Services on this form are those elements that he personally tries to include to <br />give people a good sense of what they are looking at in terms of bidding. Nothing is <br />more important than the plans. <br /> <br />3. Is there a way to get a list of everyone that attended today's meeting? <br />Yes, it will be posted on Demand Star. <br /> <br />4. Are there any bid forms showing break down prices? <br />No, there is no bid form. Submit your price in a lump sum, you do not have to break it <br />down, and that is why he tries to target all the things in Section 3. There will be an <br />Addendum with Supplemental Provisions which are housekeeping items [Note: The <br />Supplemental Provisions were already posted to DemandStar as an attachment]. Once a <br />vendor is selected we will do a Schedule of Values, and that Schedule of Values is going <br />to be a meeting to discuss item by item, a breakout of the entire project. That is where <br />we get into the nuts and bolts of what is going to be paid, and how it is going to be paid. <br />The caveat to that is, everything is inclusive, just because we don't include a particular <br />item doesn't mean that it is not part of your proposal. The proposal number comes in, <br />and that number encumbers the entire project as defined by the RFP. <br /> <br />11-05-01 Pre-Submittal Conference QA 051811 <br /> <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.