My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-02-02 Public Relations Services
>
Addendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:47:31 PM
Creation date
1/10/2012 2:34:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Addendum
Bid No. (xx-xx-xx)
11-12-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fya 's=0 7aQ <br />C,yY or SUN 00 <br />C19. This proposal item is to provide a fully functioning and properly <br />maintained grapple loader with a 30 cubic yard capacity. This is a separate item <br />for work not already covered by, and paid for through, other pertinent proposal <br />items. It is intended that this item shall cover call -outs for emergency and <br />unique situations. For this item to be accepted and paid for by the City, the <br />services must be specifically requested by the City for a specific task. <br />3.5 D. MATERIALS <br />D1. This proposal item is to include the supplying, delivery, placement, and grading of topsoil <br />in the locations designated by the City. This topsoil shall be a mix of 70% organics (peat <br />moss, etc.) and 30% sand. The supplying and placing of this item is separate and <br />unique from the normal need to supply and place this material as part of the ongoing <br />operations covered in other proposal items. For this item to be accepted and paid for by <br />the City, the service must be specifically requested by the City for a unique and specific <br />task. In areas of traffic, the proposal will include all appropriate traffic control devices <br />that conform to an approved Maintenance of Traffic (MOT) plan. All traffic control costs <br />shall be a part of the unit price proposal and shall not be paid for separately. <br />D2 -D3. This proposal item is to include the supplying, delivery, placement, and grading of either <br />Premium Red or Premium Gold (as designated by the City) colored mulch in the locations <br />designated by the City. The supplying and placing of this item is separate and unique <br />from the normal need to supply and place this material as part of the ongoing operations <br />covered in other proposal items. For this item to be accepted and paid for by the City, <br />the service must be specifically requested by the City for a unique and specific task. In <br />areas of traffic, the proposal will include all appropriate traffic control devices that <br />conform to an approved Maintenance of Traffic (MOT) plan. All traffic control costs shall <br />be a part of the unit price proposal and shall not be paid for separately. <br />D4. This proposal item is to include the supplying, delivery, placement, and grading of #70 <br />Trap Sand in the locations designated by the City. The supplying and placing of this item <br />is separate and unique from the normal need to supply and place this material as part of <br />the ongoing operations covered in other proposal items. For this item to be accepted <br />and paid for by the City, the service must be specifically requested by the City for a <br />unique and specific task. In areas of traffic, the proposal will include all appropriate <br />traffic control devices that conform to an approved Maintenance of Traffic (MOT) plan. <br />All traffic control costs shall be a part of the unit price proposal and shall not be paid for <br />separately. <br />D5. This proposal item is to include the supplying, delivery, placement, and grading of Silica <br />Sand in the locations designated by the City. The supplying and placing of this item is <br />separate and unique from the normal need to supply and place this material as part of <br />the ongoing operations covered in other proposal items. For this item to be accepted <br />and paid for by the City, the service must be specifically requested by the City for a <br />unique and specific task. In areas of traffic, the proposal will include all appropriate <br />traffic control devices that conform to an approved Maintenance of Traffic (MOT) plan. <br />City of Sunny Isles Beach I Request for Proposal No. 11 -12 -02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.