My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zurqui
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Responses
>
Zurqui
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:24:30 AM
Creation date
1/11/2012 3:05:01 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-10-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f() <br />ZURQUI <br />6 Construction Services, Inc <br />t :; # t i <br />Pre - Construction / Sr. Project Manage, <br />LEED AP <br />Underground Utility License <br />General Contractoit•s License <br />Education: BS Degree in Architecture, 2005 <br />Florida International University <br />PHONE & FAX PROJECT MANAGER I EMAIL <br />+305- 221 -6100 Eddy Gonzales Jr <br />+305- 221 -6110 Eddy @zurquis.com <br />Construction Years: Over 12 years experience in the construction industry. <br />Ms. Castrillon's primary area of experience has been in educational & miscellaneous CM @ Risk <br />projects. Ms. Castrillon has supervised and directed field and office staff, which includes preparing, <br />reviewing and administering contract documents, job planning, and value engineering. Ms. <br />Castrillon has developed and controlled job budgets and schedules. Ms. Castrillon currently handles <br />all the pre - construction and a portion of the closeout services for all the jobs in our portfolio. Her <br />education as an Architect and a LEED AP provides an invaluable service to not only our firm but all <br />the clients that we represent. <br />Pre- Construction Services Experience for CM t� Risk Projects: <br />• <br />Howard Drive Elementary (Fast Tracked) <br />Ne , 10 classroom building / 12,000 square fee! <br />• <br />Perrine Elementary (Fast Tracked) <br />Net;, 10 classroom building, PG Sheller, playground and playi,elcis / 15,000 square fire! <br />• <br />Amelia Earhart Elementary, Miami, FL <br />C,LI @ Risk QZAB renovcrlion <br />• <br />Carol City Middle, Miami, FL <br />QZAB Renovalion/lechnology upg,•ade <br />• <br />Hialeah Senior School, Miami, Florida <br />QZfi B ►•e,7o►,al ion/ Iechnolog), upgrade <br />• <br />Horace Mann Middle, Miami, Florida <br />QZAB renovation/ fech,aology upgrade <br />L) • <br />FIU Arts Studio <br />Neu, Consl,•rrclion gfflrl Studio <br />• <br />Miami Edison Senior High School <br />CXI @ Risk ADA Balhroom Upgrades / Renomitions• <br />• <br />Jane Roberts K -8 <br />C,111 @ Risk Child Drop QfJ Parking Lot Canslruclion and Canopy <br />CM q, Risk Projects Construction Management Experie>ce: <br />• Hialeah Middle School, Miami , Florida <br />CA,1@ Risk/ technology upgrade <br />• Lake Stevens Middle, Miami, Florida <br />
The URL can be used to link to this page
Your browser does not support the video tag.