My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1834
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2012 4:20:03 PM
Creation date
2/1/2012 10:02:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1834
Date (mm/dd/yyyy)
01/19/2012
Description
RFP 11-11-03/Agmt w/Tenex: Collins Ave (West Side) Sidewalk Pavers
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Include installation costs in purchase amount only where indicates as part of the <br />allowance. <br />. If requested, prepare explanation and documentation to substantiate distribution of <br />overhead costs and other margins claimed. <br />. Submit substantiation of a change in scope of work, if any, claimed in change <br />orders related to unit-cost allowances. <br />. The City reserves the right to establish the quantity of work-in-place by <br />independent quantity survey, measure, or count. <br /> <br />Contractor must submit claims for increased costs because of a change in scope or nature <br />of the allowance described in the contract documents, whether for the purchase order <br />amount or contractor's handling, labor, installation, overhead, and profit. Contractor <br />shall submit claims within fourteen (14) days of receipt of the change order or <br />construction change directive authorizing work to proceed. The City or its designee will <br />reject claims submitted later than fourteen (14) days after such authorization. Contractor <br />also agrees to the following conditions: <br /> <br />. Do not include Contractor's or subcontractor's indirect expense in the change <br />order cost unless it is clearly shown that the nature or extent of work has changed <br />from what could have been foreseen from information in the contract documents. <br />. No change to Contractor's indirect expense is permitted for selection of higher or <br />lower priced materials or systems of the same scope and nature as originally <br />indicated. <br /> <br />10.4 CHANGE ORDER PROCEDURES <br /> <br />On the City's approval of a proposal request, the City or its designee will issue a change <br />order for signatures of the City and the contractor on AlA Document 0701 or approved <br />change order form prepared by the City. <br /> <br />10.5 CONSTRUCTION CHANGE DIRECTIVE <br /> <br />Construction Change Directive. The City or its designee may issue a construction <br />change directive on AlA Document 0714 or approved change directive form prepared by <br />the City. Construction change directivc instructs Contractor to proceed with a change in <br />the Work, for subsequent inclusion in a change order. Construction change directive <br />contains a complete description of change in the Work. It also designates method to be <br />followed to determine change in the Contract Amount or the Contract Time. <br /> <br />Documentation. Contractor agrees to maintain detailed records on a time and material <br />basis of work required by the construction change directive. After completion of change <br />directive, Contractor shall submit an itemized account and supporting data necessary to <br />substantiate cost and time adjustments to the contract. <br /> <br />CONSTRUCTION SERVICE CONTRACT NO. C1 I 12-01 I <br /> <br />Page 1001'28 <br /> <br />~ V <br />~J !'.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.