Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />} <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />Project Location: Prairie Avenue, from Dade Boulevard to W. 23rd Street <br />Miami Beach, Florida <br />Client: City of Miami Beach Florida <br />Capital Improvements Project Office <br />1700 Convention Center Dr. <br />Miami Beach, Florida <br />Contact: Jose Rivas - Project Manager <br />Phone No.: (305) 673-7000 <br />Fax No.: (305) 673-7073 <br />Email: joserovas@miamibeachfl.gov <br />Construction Cost: $2,500,000 <br />Contract Starting Date: February 2008 <br />Contract Completion Date: July 2009 <br /> <br />---~ <br /> <br />/" I'#IJ~. <br />~ /,/"...... ~ ~I' '!~. <br />y .:h-'Jil;> .~ . ,!". <br />. :Ji! /" \ ~',:.i1 <br />Scope of Work - Project consisted of performing a drainage analysis of a segment of Prairie Avenue, from Dade Blvd to <br />W 23rd St, adjacent of Miami Beach Senior High School. The project area is located within Basin 76 of the City of <br />Miami Beach. The proposed improvements included a pump station system with injection wells and a new collection <br />system. The total drainage area encompasses 9.05 Ac. <br /> <br />Prairie Avenue Drainage Improvements <br />Miami Beach, Florida <br /> <br /> <br />"'~. <br /> <br />,~~ <br />""~ <br /> <br /> <br />~t . <br />~. . <br /> <br />Downtown Miami Streetscape Improvements <br />Miami, Florida <br /> <br />) <br />) <br /> <br />Project Location: NW/NE 3rd Street to the North, SW/SE 2nd <br />Street to the South, NW/SW 1st Avenue to the West, and <br />NE/SE 3rd Avenue to the East, Downtown Miami, Florida <br />Client: City of Miami Capital Improvements and <br />Tra nsportation <br />444 SW 2nd Avenue, 10th Floor, Miami, Florida, 33014 <br />Contact: Albert Sosa, P.E. <br />Phone No.: (305) 416-1224 <br />Email: asosa@miamigov.com <br />Contract Number: B-30306 <br />Contract Value: $250,000 <br />Construction Cost: $7,000,000 <br />Contract Starting Date: March 2009 <br />Completion Date: October 2009 <br /> <br />Scope of Work - Designer of record for this Project. <br />Responsible for performing field survey and inspection to <br />determine improvements necessary in Downtown Miami <br />area. Prepared engineering observations to submit to City of <br />Miami. Responsible for producing a set of plans detailing the <br />necessary improvements for the beatification of the <br />Downtown Miami area. Plans included design of milling and <br />resurfacing, paving and grading, signing and pavement <br />marking, curb and gutter, ADA Ramps, lighting plans and <br />calculations, and landscaping. <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br /> <br /> <br />9 <br />