Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />Review by the Quality Control Engineer. Each document will receive a stamp that tracks when the document was <br />submitted for quality control, when it was reviewed by the Quality Control Engineer, and when the comments were <br />incorporated into the document and back checked. The Project Manager's responsibility is to make sure that the <br />quality control process for each discipline has been completed. The APCTE Project Manager, Mr. Arnelio Alfonso, P.E. <br />will also monitor each sub-consultant to assure that they comply with their internal Quality Control Plan. When all the <br />QA/QC procedures are completed the Quality Control Engineer performs an audit to ensure that this process has <br />taken place and signs the compliance certification form stating that all procedures have been followed and the <br />document is ready for submittal. The marked up set of prints from this process will be sent to the City with each <br />review. <br /> <br />Two weeks prior to submittal of all project documents, an independent peer review will be conducted to make sure <br />that all items have been accomplished. Following this evaluation, the Quality Assurance/Quality Control Engineer will <br />also perform an independent review of the project documents and shall take into consideration the technical content, <br />the format and presentation. In addition, he will review each document to guarantee that all project goals and <br />objectives are met. <br /> <br />In the plans review process different colors will be used to identify the various stages of the checking process. <br /> <br />IYellow lis used by the checker to indicate agreement, and all lines, dimensions, and written text are to be <br />yellowed in if correct <br />_ is used by the checker to indicate corrections and additions <br />_ is used by the back checker to indicate approval of checker's changes, plus additional <br />changes as agreed to by checker <br />.. is used to indicate that changes to the document original have been made <br />_ is also used to verify that the change to the document original is correct <br />mm is used for non-record comments or instructions <br /> <br />Constructabilitv / Bidabilitv Review: <br />A Constructability / Bidability Review Team headed by Mr. Nelson Perez, P.E. (APCTE), will support the QA/QC Team. <br />Mr. Perez is very knowledgeable in roadway construction. Four weeks before each submittal our Constructability <br />Review Team will review the plans to identify and build into the plans construction efficiencies that can benefit the <br />construction schedule and also identify errors, omissions and foreseeable problems that can have an adverse impact <br />on the construction cost or duration. An in depth bidability review will be done prior to the final submittal. <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br />18 <br />