My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&p Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
A&p Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 4:37:50 PM
Creation date
2/9/2012 4:35:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />3.2 Availability <br />Our firm has just completed some of its major assignments for the Florida Department of Transportation - District VI <br />and the City of Miami Beach, as well as the Design-Build Miami Lakeway North Drainage Improvements Project, <br />meaning that our current backlog is such that we will easily be able to meet the man-hours required for this project. <br /> <br />After a thorough review of the Scope of Services for this contract, we are fully convinced that we will be able to <br />provide prompt services and a quick turnaround for every project. We will skip straight through the "learning <br />curve" and complete all tasks in strict adherence to the City's schedule. <br /> <br />The chart on this page shows our availability for the next 2 years for the personnel assigned to the 174th Street <br />Drainage Improvement Projects. The staff time available was obtained by deducting previous project commitments <br />from staff total time. The availability on this chart shows that we have 22,000 man-hours available for this project: <br />More than what will be needed to complete this assignment. <br />Our Team's organizational chart also depicts the key staff <br />personnel table where we show percentage of availability for <br />each staff member for the next two years, and is found at the <br />end of this section. The personnel listed in the organizational 14000 <br />chart include key representatives of all the companies that 12000 <br />have joined us for this solicitation, as well as an additional 10000 <br />pool of available staff to be employed as needed. APCTE will <br />take the role of lead consultant and consequently will be <br />ultimately responsible for the execution of this contract. <br />Among the Team members assigned to this project, 13 are <br />registered professional engineers with extensive experience <br />working on multiple Roadway and Drainage Improvement <br />projects. The other Team members of the APCTE Team are: <br />Hadonne - Responsible for Surveying, Mapping and <br />Subsurface Utility Engineering and Geosol, Inc. in charge of all <br />Geotechnical Activities. <br /> <br /> <br />STAFF TOTAL <br />HOURS <br />55,000 MH / 2 <br />yrs <br /> <br />8000 <br /> <br />6000 <br /> <br />4000 <br /> <br />2000 <br /> <br />o <br /> <br />Jan. 2012 to <br />June 2012 <br /> <br />July 2012 to <br />Dec. 2012 <br /> <br />Jan. 2013 to <br />June 2013 <br /> <br />3.3 Quality Control <br />Quality Control and Assurance begins with APCTE's commitment to the City of Sunny Isles Beach to <br />provide qualified professionals that are experienced in all required disciplines. This can be achieved <br />through an experienced Project Manager that is supported by an independent Quality <br />Assurance/Quality Control Engineer, and by the assignment of senior staff capable of effectively <br />planning, communicating, supervising and providing technical direction. <br /> <br />For this project, the Quality Control Engineer will be Mr. Carlos Gil-Mera, P.E., c.G.c. (APCTE), who <br />is a Professional Engineer with over 24 years of experience working in the production of roadway <br />plans. With each project submittal, the project manager will make sure that all production related <br />checks have been completed and that the document is ready for an independent Quality Control <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br />July 2013 to <br />Dec. 2013 <br /> <br />I..'.. <br /> <br />l .' ...~... <br />, > <br />,,/<: // I <br />.//. <br /> <br /> <br />Quality Control <br />RECORD DOCUMENT <br /> <br />ChMkMl_ ~w_ <br />"CNuLI_ hW_ <br />CorrMtlIldl htM <br />Y.nfieD~ o.w~ <br />A Quality Driven <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.