Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />KEY PERSONNELRESUME ~ <br />A&P CONSULTING TRANSPORTATION ENGINEERS ~ <br /> <br />. EITHEL M. SIERRA, P.E. PAGE 2/2 <br /> <br />Signing adn Pavement Marking <br /> <br />from FEC Railroad to NE 2nd Avenue. The project included <br />roadway reconstruction, new drainage, sidewalk, curb and gutter, <br />new lighting, bycicle lane, signing and pavement markings, <br />landscaping, and a new 12" water main. Project scope also <br />included the Milling and Resurfacing of South Miami Avenue from <br />1-395 to NW 15th Street. Scope of work also involved utility <br />coordination, preparing cost estimates, obtaining all permits <br />including DERM, Miami-Dade County Public Works, Department <br />of Health, and City of Miami Public Works. Special attention was <br />given to the Maintenance of Traffic to maintain property accessto <br />business and pedestrians all the time. <br /> <br />DOWNTOWN STREETSCAPE IMPROVEMENTS <br />Client: City of Miami.(David Mendez, P.E., Project Manager (305) <br />416-1240). Engineer of Record / Project Manager for the <br />preparation of Contract Plans and Specifications for the Downtown <br />Streetscape Improvements. Project limits were: NW / NE 1 st, 2nd, <br />and 3rd Street from SW 1stAve. to SR 5/ Biscayne Blvd.; SW / SE <br />1 st and 2nd Street from SW 1 st Ave. to SR 5/ Biscayne Blvd; and <br />SW 1 stAve, Miami Ave, NE 1st, 2nd, and 3rd Avenue from SW / SE <br />2nd Street to NW / NE 3rd Street. Project included Milling and <br />Resurfacing, new colored sidewalk, decorative lighting system, <br />street furniture, stamped asphalt pedestrian crosswalks, signing <br />and pavement marking. Utility Coordination was a major milestone <br />in this project, especially with FPL for the upgrade of the lighting <br />system. <br /> <br />BISCAYNE BOULEVARD RECONSTRUCTION <br />Client: City of Miami (Kevin A. Brown, P.E" (305) 416-1090). Design <br />Start/Finish Date: June, 2005/ February, 2006 Engineer of Record/ <br />Project Manager for the preparation of Contract Plans and <br />Specifications of the reconstruction of SR-5 / Biscayne Boulevard <br />from NE 14th Street to NE 15th Street. The project also included <br />sidewalk, curb and gutter, new drainage, lighting, landscaping, <br />signing and pavement markings, and signalization. This <br />improvement was an emergency reconstruction of the Biscayne <br /> <br />segment funded by FDOT due the grand opening of the new <br />Performance Art Center (PAC). Scope of service also involved utility <br />coordination, specifications, construction cost estimates and <br />obtaining all related permits (DERM), FDOT, City of Miami Public <br />Works, and Miami Dade County Public Works. <br /> <br />N.W. 37TH AVENUE <br />Client: M-D PWD. (Raul Quintela, P.E., Project Manager (305) 375- <br />3971). Senior Project Manager / Engineer of Record for the <br />preparation of Contract Plans of the total roadway reconstruction of <br />a 2.72 mi segment of NW 37th Avenue from NW N. River Drive to <br />NW 79th Street. Project includes new drainage, signalization, <br />lighting, signing and pavement marking design and compliance <br />with ADA requirements. Special emphasis was given to the Traffic <br />Control Plans to provide pedestrian access to local businesses and <br />major relocation coordination with Florida Power and Light and <br />Florida City Gas. <br /> <br />WASHINGTON AVENUE IMPROVEMENTS PHASES II, IV & V <br />Client: City of Miami Beach (Charles Carreno, P.E., Project Man- <br />ager (305) 532-9292). Senior Project Engineer in charge to <br />prepare construction documents (plans and specifications) for the <br />following improvements: milling & resurfacing, new gravity drainage <br />wells, sanitary sewer capacity improvements which consist of <br />pipe/manhole up-sizing, water main upgrades, relocation of water <br />meters/meter boxes, new decorative lighting system, landscape <br />and irrigation upgrades, replacement of curb & gutter and sidewalk <br />from 11th St. to 16th St., design of intersection bumps-outs, <br />compliance with ADA requirements, modification of parking space <br />layout, relocation of existing utilities, coordination with the CMB <br />Parking Department to remove and reinstall parking meter heads <br />and parking signs, & signature median improvements from 5th St. <br />to 6th St., between 16th to Lincoln Rd. and along Lincoln Rd from <br />Washington Ave to Collins Ave. <br /> <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS . <br />