Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />, <br />J <br />J <br />, <br />) <br />) <br />) <br />) <br />) <br /> <br />Request for Qualifications <br />Civil Engineering Services to Design Street and Drainage Improvements RFQ#11-11-02 <br /> <br /> <br />2.4 Satisfactory Record of Past Performance <br />The following tables contain a list of some of the projects completed by APCTE in the past five (5) with their associated <br />grades. These projects covered the range of services required in this Request for Qualifications (RFQ). The first <br />evaluations shown below were received by our company from FOOT-District Six Office and are based on a scale of <br />5.0. The second evaluation shown below was received from Miami-Dade County Public Works Department and is <br />based on a scale of 4.0. <br /> <br />F.M. No.: 405575-1-32-01 (Florida Department of Transportation District VI) <br />Project Name: SR.997 / Krome Avenue <br />FOOT Project Mana~er: Adriana Manzanares, P,E. (305) 470-5283 <br /> "" <br /> z <br /> .., .., ,... <br /> 0 ""l;; .., ~ z <br />"- ,,-\oJ >- ..J .., ~ <br />0;.: O~\oJ t;j..J "" ~ '" 0 <br /> 0 <br />"'00 u'" :l ~ < ... <br />..,,, ""...< ,,~ < z ~ <br />"'0 ~~G ~8 g < 8 <br />c~ u ::F. <br /> '" <br />3.2 Major Roadway Design 2/01/07 60% 4.9 4.8 14.9 4,9 <br />3.2 Major Roadway Design 7/07/10 190% 4.7 4.8 14.6 4.7 <br /> <br />Contract No.: 2004-0330 (Miami-Dade County Public Works Department) <br />Project Name: NW 37''' Avenue, from NW 791" Avenue to N, River Drive <br />M-D Public Works Department Project Manager: Raul Quintela, P.E, (305 375-3971 <br /> '" <br /> rJ) "" <br /> \oJ Z <br /> Z .., 0 <br /> 0 .., \oJ \oJ ~ <br /> :....~ """" "" ..J Z <br />"- z::J \oJ ;:::) .., ;:::) <br />0;.: o~.., ..J '" 0 <br />..,... ... 0 < ... <br />..,,, \oJ 00 ~::F. ~ ~ z ~ <br />"'0 ""...< <br />~~G ..,0 8 u < 0 <br />c~ .... <br />... '" JI":. u <br />3.2 Highway Design 5/14/09 90% 14 3 3.6 <br />10.01 Storm Water Drainage Design 5/14/09 90% 14 3 .. 3.6 <br /> <br />As shown, the compounded grading that APCTE has received in the past five years for all of the provided services have <br />been at or above 4.7 points out of 5.0 for FDOT projects and 3.6 out of 4.0 for Miami-Dade County projects. <br /> <br />2.5 Similar Projects <br />A list of APCTE's experience on previous similar projects is included in the following pages. <br /> <br />A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br /> <br />5 <br />