Laserfiche WebLink
City of Sunny Isles Beach RFQ No. 12 -01 -03 <br />19 Development of Site Plans and Survey for Placement of a Temporary Trailer <br />4. APPROACH / METHODOLOGY <br />A. Approach <br />Working in partnership with the Team will ensure a safe facility site design that will be cost - effective to <br />build and effective to operate within the life cycle of the facility. <br />The facility will be designed to provide: <br />• ease of access to site <br />• ease of access to and from components within site <br />• building connections to structure capable of withstanding impact from storm <br />events <br />• Civil engineering — Conceptual and detailed site engineering leading to effective <br />solutions <br />• Landscape Architecture — Conceptual and detailed landscape design following <br />sustainable solutions <br />• Architecture — Conceptual and detailed design, proactive/ effective project <br />management <br />• Structural Engineering —Conceptual and detailed design of foundations <br />• Cost Estimating — current cost estimating with each deliverable <br />jorge a gutierrez architect Ilc hi 19 <br />