My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-03 Dev. plans and Survey for Temp Trailer
>
Responses
>
Jorge A. Gutierrez Architect LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 9:06:00 PM
Creation date
2/15/2012 11:23:24 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Dev. Plans and survey for Temp Trailer
Bid No. (xx-xx-xx)
12-01-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />rj <br />4 <br />f <br />=fir <br />20 <br />B. Methodology <br />City of Sunny Isles Beach RFQ No. 12 -01 -03 <br />Development of Site Plans and Survey for Placement of a Temporary Trailer <br />Due Diligence Review <br />• Obtain site survey <br />• Obtain Underground utilities survey <br />• Review existing site as built plans <br />• Review facility & space program <br />• Review existing site limitations, conflicts and possibilities available to inform design <br />• Re- assert City project objectives, needs, program requirements <br />• Re- assert City budget goals <br />• Re- assert City project time constrains <br />• Establish project sustainability goals <br />Schematic Plans and Specifications <br />• Develop plans and specifications <br />• Architectural Site building codes analysis <br />• Civil Engineering conceptual plan <br />• Structural Engineering conceptual <br />• Electrical, Fire Alarm Engineering conceptual design <br />• Landscape Architecture Conceptual plan (xeriscaping & low maintenance design) <br />• Outline Specifications <br />• Cost Estimate — preliminary <br />• Establish basic design relationships between programmed components <br />• Establish coordination between design disciplines <br />• Ascertain compliance with City project goals and objectives <br />Final Plans and Specifications <br />• Develop Final Plans and Specifications <br />• Architectural, Civil Engineering, Landscape Architecture, Structural Engineering, <br />Electrical, Plumbing, Fire Alarm System <br />• Engineering plans and specifications developed to 100% <br />• Cost Estimate <br />• Developed plans have incorporated and meet City project needs, requirements, <br />goals and objectives <br />• Developed plans have been coordinated to ensure compliance with applicable <br />codes and regulations <br />• Developed plans have been coordinated between design disciplines to ensure <br />Quality <br />• Cost Estimate will ensure compliance with City budget requirements <br />jorge a gutierrez architect Ilc 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.