Laserfiche WebLink
<br />) <br />) <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br />) <br /> <br />) <br /> <br /> <br />Prolection Resources <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 11 <br /> <br />. Outerbridge Crossing <br />. GWB Bus Station <br /> <br />) <br /> <br />Engineering, Design and Inspection Services - Citywide ITS Related and Planning Projects <br />Client: New York City Dept. of Transportation <br />GPI is providing planning and design services for citywide Intelligent Ttansportation System (ITS) related <br />and planning projects. This agreement provides engineering services for sutvey, street/ highway design, traffic <br />engineering/ analysis and simulation, structural design, inspection, shop drawing review, value engineering, <br />construction inspection and constructibility review activities. Project tasks include: field evaluations, <br />establishment of operational concepts and design criteria, preparation of ITS system architecture, hardware, <br />software and communications, system integration requirements, contract plan development and community <br />information outreach program. <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />On-Call assignments conducted to date include the following: <br />. Lane Control Signal Systems, Staten Island, NY. Completion: 2008. Fee: $352,890.14 <br />. Lane Control Signal Systems at Father Capodanno Boulevard, Francis Lewis Boulevard and <br />Baychester Avenue. Completion: 2009. Fee: $43,884 <br />. Hylan Boulevard Contra Flow Study, Staten Island, NY. Completion: 2007. Fee: $147,617.38 <br />. Staten Island-Brooklyn Mobility Enhancement - Ttaffic Signal Control for Transit Vehicles at <br />Victory Boulevatd, Staten Island, NY. Completion: 2007. Fee: $244,583.54 <br />. ITS Pedestrian Signal Survey, New York, NY. Completion: 2008. Fee: $128,665.25 <br />. ITS West Side Study Outreach, New Y otk, NY. Completion: 2007. Fee: $4,854.13 <br />. Citywide Congested Corridor Progtam Church Avenue and \\!hite Plain Road, Various Locations, <br />NY. Completion: 2009. Fee: $538,701.81 <br />. ITS Adaptive Traffic Signal Control, New York, NY. Completion: 2008. Fee: $36,802.06 <br />. ITS Assignment 5 Hylan Blvd. Modification TM 3&5, New Yotk, NY. Completion: 2008. Fee: <br />$4,964.96 <br />. West Hudson Reservoirs Speed Study. Completion: 2009. Fee: $247,914.99 <br />. Senior Pedestrian Focus. Completion: 2009. Fee: $ 594,010.62 <br />. Phase 2 ITS Pedestrian Signal Sutvey. Completion: 2009. Fee: $548,626.55 <br />. Victory Blvd TSP. Completion: 2009. Fee: $11,106.90 (Extra) <br />. Safe Streets for Seniors Study, Phase II. Completion: 2010. Fee: $672,443.74 <br />. ITS Cross Bay Boulevard Ttaffic Signal Timing Progression. Completion: 2008. Fee: $13,187.33 <br />. Adaptive Signal Control Phase II. Completion: 2010. Fee: $359,804 <br />. Phase 2 Timing Initiative. Completion: 2009. Fee: $155,465.86 <br />. Phase 3 Timing Initiative, Queens, Brooklyn, Bronx, Staten Island, NY. Completion: 2010. Fee: <br />$669,442 <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 11 <br />230 Park Avenuc, Suitc 440, Ncw York, NY 10169 . tel: 212.422.0000 . fax: 212.422.3305 . www.tmprotcetion.col11 <br />This business is 1iccnsed by the New York Departmcnt of State, Division of Liccnsing Serviccs <br />