<br />)
<br />)
<br />)
<br />
<br />)
<br />
<br />)
<br />
<br />)
<br />)
<br />
<br />)
<br />
<br />
<br />Prolection Resources
<br />
<br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 11
<br />
<br />. Outerbridge Crossing
<br />. GWB Bus Station
<br />
<br />)
<br />
<br />Engineering, Design and Inspection Services - Citywide ITS Related and Planning Projects
<br />Client: New York City Dept. of Transportation
<br />GPI is providing planning and design services for citywide Intelligent Ttansportation System (ITS) related
<br />and planning projects. This agreement provides engineering services for sutvey, street/ highway design, traffic
<br />engineering/ analysis and simulation, structural design, inspection, shop drawing review, value engineering,
<br />construction inspection and constructibility review activities. Project tasks include: field evaluations,
<br />establishment of operational concepts and design criteria, preparation of ITS system architecture, hardware,
<br />software and communications, system integration requirements, contract plan development and community
<br />information outreach program.
<br />
<br />)
<br />
<br />)
<br />
<br />)
<br />
<br />)
<br />
<br />)
<br />
<br />On-Call assignments conducted to date include the following:
<br />. Lane Control Signal Systems, Staten Island, NY. Completion: 2008. Fee: $352,890.14
<br />. Lane Control Signal Systems at Father Capodanno Boulevard, Francis Lewis Boulevard and
<br />Baychester Avenue. Completion: 2009. Fee: $43,884
<br />. Hylan Boulevard Contra Flow Study, Staten Island, NY. Completion: 2007. Fee: $147,617.38
<br />. Staten Island-Brooklyn Mobility Enhancement - Ttaffic Signal Control for Transit Vehicles at
<br />Victory Boulevatd, Staten Island, NY. Completion: 2007. Fee: $244,583.54
<br />. ITS Pedestrian Signal Survey, New York, NY. Completion: 2008. Fee: $128,665.25
<br />. ITS West Side Study Outreach, New Y otk, NY. Completion: 2007. Fee: $4,854.13
<br />. Citywide Congested Corridor Progtam Church Avenue and \\!hite Plain Road, Various Locations,
<br />NY. Completion: 2009. Fee: $538,701.81
<br />. ITS Adaptive Traffic Signal Control, New York, NY. Completion: 2008. Fee: $36,802.06
<br />. ITS Assignment 5 Hylan Blvd. Modification TM 3&5, New Yotk, NY. Completion: 2008. Fee:
<br />$4,964.96
<br />. West Hudson Reservoirs Speed Study. Completion: 2009. Fee: $247,914.99
<br />. Senior Pedestrian Focus. Completion: 2009. Fee: $ 594,010.62
<br />. Phase 2 ITS Pedestrian Signal Sutvey. Completion: 2009. Fee: $548,626.55
<br />. Victory Blvd TSP. Completion: 2009. Fee: $11,106.90 (Extra)
<br />. Safe Streets for Seniors Study, Phase II. Completion: 2010. Fee: $672,443.74
<br />. ITS Cross Bay Boulevard Ttaffic Signal Timing Progression. Completion: 2008. Fee: $13,187.33
<br />. Adaptive Signal Control Phase II. Completion: 2010. Fee: $359,804
<br />. Phase 2 Timing Initiative. Completion: 2009. Fee: $155,465.86
<br />. Phase 3 Timing Initiative, Queens, Brooklyn, Bronx, Staten Island, NY. Completion: 2010. Fee:
<br />$669,442
<br />
<br />)
<br />
<br />)
<br />
<br />)
<br />
<br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 11
<br />230 Park Avenuc, Suitc 440, Ncw York, NY 10169 . tel: 212.422.0000 . fax: 212.422.3305 . www.tmprotcetion.col11
<br />This business is 1iccnsed by the New York Departmcnt of State, Division of Liccnsing Serviccs
<br />
|