Laserfiche WebLink
<br />r 1 <br /> <br />rl <br /> <br />r 1 <br />~ 1 <br /> <br />r 1 <br /> <br />r 1 <br />I <br />, I <br /> <br />r 1 <br />I <br />I <br />J <br /> <br />I 1 <br /> <br />. I <br /> <br />l J <br /> <br />. J <br /> <br />Margaret Pace Park Reconstruction, Phase I & II <br />Miami, Florida <br /> <br />CLIENT <br />City of Miami (Owner) <br />H.J. Ross / TY Lin, Inc. (Client) <br /> <br />CLIENT CONTACT <br />Charles Deeb, P.E. <br />Principal <br />H.J. Ross / T.Y. Lin, Inc. <br />Coral Gables, Florida <br />305.567.1888 <br /> <br />YEAR COMPLETED <br />2003 <br /> <br />DESCRIPTION <br /> <br /> <br />CES Consultants, Inc. (CES) provided engineering, construction management, and inspection services <br />during the reconstruction of Margaret Pace Park in the City of Miami. The project was part of the <br />Community Redevelopment Agency's (CRA) mandate to revitalize specifically designated areas <br />within the city through good planning and the implementation of sound infrastructure improvements; <br />doing so enabled the City to generate successful redevelopment projects from both the private and <br />public sectors, eradicating urban decay from the targeted areas. <br /> <br />The services provided by CES personnel consisted of the following: <br /> <br />./ Design review and coordination with design consultant <br />./ Inspection of water and sewer line installation <br />./ Inspection of new storm drainage installation <br />./ Inspection of all roadway improvements within the park <br />./ Inspection of new landscaping <br />./ Contract administration <br />./ Interagency Coordination <br />./ Progress payment review and approval <br />./ Final inspection and project closeout <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 13 <br />