Laserfiche WebLink
<br />rl <br />rl <br /> <br />r 1 <br />I <br /> <br />, 1 <br />~ I <br /> <br />r I <br /> <br />, 1 <br /> <br />Miami-Dade County Performing Arts Center <br />Miami, Florida <br /> <br />OWNER <br />Miami-Dade Performing <br />Arts Council <br />Tallahassee, FL <br /> <br /> <br />CLIENT CONTACT <br />Adrienne Arsht Center <br />for the Performing Arts <br />1300 Biscayne Blvd <br />Administrative Offices <br />(786) 468-2000 <br /> <br />COMPLETION DATE <br />2006 <br /> <br />CONSTRUCTION COST <br />$450 Million <br /> <br />. , DESCRIPTION <br /> <br />Completed in 2006, the Adrienne Arsht Center for the Performing Arts is the second largest performing <br />arts center in the United States, behind New York City's Lincoln Center. It was designed by famed <br />architect Cesar Pelli, who is also known for designing the Petronas Twin Towers in Kuala Lumpur, <br />Malaysia. <br /> <br />The 570,000 square-foot structure occupies both sides of Biscayne Boulevard in Downtown Miami, and <br />is joined by a pedestrian bridge. Four venues make up the center, the two largest being Ziff Ballet <br />Opera House and Knight Concert Hall. Both of these venues seat approximately 2,000 patrons each. <br />The Peacock Rehearsal Studio and Studio Theater, the remaining venues, are meant for smaller, more <br />intimate performances and each accommodate an audience of approximately 260. The Miami- <br />Dade Performing Arts Trust constructed this unique center. <br /> <br />CES staff provided Construction Management services, including the following: <br /> <br />./ QA/QC <br />./ Structural Engineering services <br />./ Materials Testing <br />./ Backfill Inspections <br />./ Fire Proofing Inspections <br />./ Shop and Field Welding Inspections <br />./ Shipment Audits <br />./ Steel Erection Monitoring <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 15 <br />