Laserfiche WebLink
<br />'1 <br />'1 <br /> <br />r1 <br />I <br /> <br />'1 <br /> <br />1 <br /> <br />Miami VA Healthcare System Facility - Mobile O.R. <br />Trailers <br />Department of VA <br />Miami-Dade County, Florida <br /> <br />OWNER <br />Department of Veterans Affairs <br /> <br /> <br />CLIENT CONTACT <br />Department of Veterans Affairs <br />1201 NW 16th street <br />Miami, FL <br />Darnell Cox <br />Ph: 786.251.3047 <br /> <br />COMPLETION DATE <br />Ongoing <br /> <br />CONSTRUCTION COST <br />$1,600,000 <br /> <br />DESCRIPTION <br /> <br />CES was commissioned to provide site preparation and construction services for a climate-controled <br />corridor/storage complex located on the east side of Building No. 1 of the Miami Veterans Affairs <br />Healthcare System Facility located at 1201 NW 16th Street, Miami, FL 33125. This corridor was to be an <br />ambulatory care addition between the emergency room's ambulance entrance canopy and the <br />spinal cord center's entrance canopy. <br /> <br />The project involves the construction of a c1imate-controled corridor attached to the existing hospital, <br />which incorporates five (5) MMIC Mobile Surgical Units and one (1) MMIC Mobile Staff Unit into one <br />complete surgical suite. CES provided all necessary utility requirements to provide power, <br />communication, electrical, water, sanitary, and medical gas services necessary to make the units fully <br />operational. CES worked from a set of design drawings produced by Mobile Medical International <br />Corporation (MMIC). <br /> <br />Construction services included: <br /> <br />./ Provide all materials necessary to construct the trailers <br />./ Provide all necessary utilities for the complete operation <br />./ Ensure handicap compliance <br />./ Electrical, Plumbing, HV AC, Fire Protection, Alarm, <br />./ Masonry, Roofing, Flooring, Steel Joists, Painting, and <br />./ Provide all necessary structural, architectural, civil, <br />./ systems to make the trailer complex fully operational <br />./ Provide all safety pre-cautions on the project site <br />./ Abide by the Medical Center Construction policy <br />./ Provide all necessary product submittals to the COTR <br />./ Provide a set of red line as-built drawings to the VA <br />./ Provide daily logs and safety sheets to the COTR <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 17 <br />