My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:35:57 PM
Creation date
5/7/2012 2:28:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />~ ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />meet with City Staff review all comments and obtain direction for further development to be <br />reflected in 90% plans. <br /> <br />Task 4 - Detailing Refinement and 90% Plans <br /> <br />4.1 Detailing Refinement <br />Using the reviewed 60% Plans as a basis coupled with city-issued directives, the CGA team will <br />modify any design detailing to incorporate minor modifications requested and ensure that those <br />changes are reflected in all applicable plans. The 90% construction plans will again be filtered <br />though a follow-up "ConstructabiIity Analysis" of all project elements through our Quality Assurance <br />Program. <br />4.2 Revised Technical Specifications <br />The CGA Team will develop revised Technical Specifications to reflect construction and installation <br />specifications for all planned components. <br />4.3 Refined Opinion of Cost Estimate <br />The CGA Team will refine the Opinion of Cost Estimate to reflect any 90%-level modifications to <br />ensure that all elements can be implemented within the established $1 million construction budget. <br /> <br />4.4 City Review 90% <br />CGA will submit a complete set of all 90% plans to City Staff for review and comment. CGA will meet <br />with City Staff review any comments and obtain direction to proceed with assembling final 100% <br />construction plans. <br /> <br />Task 5 - Prepare Permit Applications <br /> <br />5.1 Submittal Packages <br />CGA will prepare all necessary permit application packages to be provided to all applicable and <br />regulating agencies, including but not limited to the City's Building Department, Miami-Dade <br />County's PERA and Water and Sewer Department. The City will be responsible for all permit <br />application fees. <br /> <br />5.2 Agency Comments and Revisions <br />CGA will meet with the City and address any comments needed to obtain approvals from the <br />reviewing agencies. <br /> <br />Task 6 - 100% Construction Plans and Bidding Documents <br />After securing all necessary permits, the CGA team will finalize all plans and issue four copies of signed and <br />sealed sets for City records. CGA will also provide the City with necessary Bidding Documents, including: <br />. Bid Tabs for contractor bid tabulation <br />. Technical Specifications in PDF format <br />. Approved 100% plans in PDF format <br /> <br />Task 7 - Bidding and Construction Administration <br />7.1 Bidding <br />The CGA Team will assist the City in bidding services, contractor versification, reference checks and <br />bid comparisons in order to generate a Recommendation for Award to the City. <br />7.2 Construction Coordination <br />The CGA Team will maintain a strong and efficient communication link between the City's Project <br />Manager and/or designee, as directed and the Contractor to coordinate the construction schedule <br />and anticipated milestones required for the project. <br />7.3 Meetings and Visits <br />The CGA Team will coordinate and document the following through the overall team: <br />. Pre-Construction meeting <br /> <br />RFQ 12-04-04 Sunny Isles Beach Intracoastal Parks <br /> <br />4- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.