My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:35:57 PM
Creation date
5/7/2012 2:28:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />7.4 <br /> <br />7.5 <br /> <br />7.6 <br /> <br />. Value Engineering meetings <br />. Attendance of resident information meetings <br />. Weekly construction meetings <br />. Contract specific meetings <br />. Specialty AlE Consultant site visits <br />. Equipment start-ups <br />Field Inspections <br />The lead inspector or assistant inspector shall document the following on a daily basis: <br />. Weather conditions <br />. Contractors work force and description of work <br />. Subcontractors on site and work force <br />. All equipment on site and utilized <br />. Visitors to project site <br />. Tests and results <br />. Construction difficulties and measures taken <br />. Significant delays and why <br />. Disputes between City, resident, or contractor <br />. Any field directives issued <br />. Record of materials <br />. Summary of field meetings <br />. Any non conforming work <br />. Log of photos taken <br />. MOT Inspections <br />. Request for services during tie-ins <br />Contractual Items <br />The CGA Team shall work together to first, field-verify items and then present the following items <br />to the City: <br />. Adherence to contract documents <br />. Review and prepare pay requests <br />. Certification of materials <br />. Issuance of non-compliance notices <br />. Damage to existing or new facilities <br />. Change order responses <br />. Requests for information <br />. Project schedule <br />. Documentation of vendor or subcontractor liens <br />. Equipment tests and startups <br />. Project safety <br />. Quality control <br />Closeout and Final Completion <br />The CGA Team will meet the contractual requirements as specified by the Contract Plans to include: <br />. Substantial completion documentation <br />. Warranty periods <br />. Release of liens <br />. Bond and surety acceptance <br />. Punch list items and follow ups <br />. Walk-throughs <br />. Operation and maintenance manuals <br /> <br />RFQ 12-04-04 Sunny Isles Beach Intracoastal Parks <br /> <br />4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.