My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Manuel Synalovski Assoc., LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Manuel Synalovski Assoc., LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 3:07:01 PM
Creation date
5/7/2012 3:04:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />) <br />, <br />1 <br />) <br />) <br />) <br />) <br />) !\ <br />_J <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />PRICE. MSA will assist the City of Sunny Isles Beach during the bidding of the project. We will work with <br />the City on determining the best method of bidding to pursue. We will prepare the bid documents that <br />will be distributed, coordinate the bid process, respond to any requests for information during the <br />bidding, analyze the bids received and provide the City of Sunny Isles Beach with the recommendation <br />on the award of the construction contract. <br /> <br />CONSTRUCT. Finally, we arrive at the construction phase of the project and our participation and <br />continued communication will be critical to the success of the building process. During the <br />construction, the design team will remain an active participant by attending the regular construction <br />progress meetings and by performing the tasks identified below: <br /> <br />. <br /> <br />Advise the City of Sunny Isles Beach on all aspects of the construction project. <br /> <br />. <br /> <br />Review Shop Drawings and Submittals provided by the contractor, <br /> <br />. <br /> <br />Make periodic site visits to the project to observe the progress at <br />appropriate intervals in the progress of the work. <br /> <br />. <br /> <br />Assure that a high level of workmanship is maintained and achieved. <br /> <br />. <br /> <br />Issue instructions to the contractor, should any interpretations and <br />clarifications be required, <br /> <br />. <br /> <br />Review, evaluate and approve progress payments due based upon <br />the progress of the work completed, <br /> <br />. <br /> <br />Observe the initial operation of the building systems and confirm <br />compliance with the specifications, <br /> <br />. <br /> <br />Perform a final punch list. <br /> <br />. <br /> <br />Report and establish final project completion, including recommending <br />final payment at the appropriate time and retainage reduction, if appropriate, <br /> <br />. <br /> <br />Submit AutoCAD format record documents to the City of Sunny Isles Beach. <br /> <br />CELEBRATE. Lastly, we will celebrate with the City of Sunny Isles Beach at the opening or reopening of <br />the project building site. The legacy of the project will live on for current and future residents to enjoy <br />for years to come, <br /> <br />RFQ # 12-04-04 <br /> <br />30 <br /> <br />i1 <br /> <br />MANUEL SYNAlOVSKI ASSOCIATES, llC <br />dfl'MII'i/lHt'. iH/uillr jfl'i-i~n . J,li1IHli'I.~ <br /> <br />- <br /> <br />[l <br />
The URL can be used to link to this page
Your browser does not support the video tag.