My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alta Management Co. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Alta Management Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 4:06:10 PM
Creation date
6/14/2012 4:01:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Experience & References: <br />a) Alta Management Company's Project Experience for the last 10 years is listed below: <br />• 2010 to 2011 F. CATANIA & ASSOC. <br />1420 Royal Mount <br />Montreal, Quebec, Canada <br />Program and Procurement management services for the Chateau Maplewood Condominium <br />Project in Montreal. The project has a potential LEED Silver Rating. The Project consists of the <br />remodeling of an existing `Historical Structure', built in 1925 and the addition of a six story <br />underground garage. The 142 Unit, high -end Project has a total budget of $180 Million. A <br />recommendation letter by the Owners of the Project, by Mr. Andre Fortin, President of F. <br />Catania, is attached on page #14. <br />• 2008 to 2010 ARTECITY MANAGEMENT, INC. <br />2100 Park Avenue <br />Miami Beach, Florida <br />Construction Management services for the Arte City Condominium Project in Miami Beach. <br />Total Project cost volume was $43 Million. Project consisted of a total of five buildings, a 6 story- <br />55 unit tower, a 5 story- 57 unit tower and three stand alone two story, "historical" buildings with <br />28 units, for a total of 140 units. Project included a one level, `underground basement' parking <br />garage. The Owner's of the Project are based in Italy and no longer available. Attached on <br />page #15, is a letter of recommendation from Mr. Erik T. Lewis, who was the Bank inspector for <br />the lender. Mr. Lewis was also the Corus Bank Inspector for the Continuum II Project. <br />• 2005 to 2008 SOUTH BEACH OCEAN PARCEL II, LLC <br />100 South Point Drive <br />Miami Beach, Florida <br />Construction Management services for the 40 story, 207 Unit, The CONTINUUM Phase II <br />Condominium Project in Miami Beach, Florida. Total Project cost volume was $200 Million. The <br />Project included a two level `podium' parking garage, the adjacent Pavilion Restaurant, 14 <br />Cabanas and a resort style Main Pool. The Project was successfully completed in March of <br />2008. A letter of recommendation from Seth Goldman the Director of Development is attached <br />on page #16. <br />• 2002 to 2005 MERCO GROUP, LLC <br />6365 Collins Avenue <br />Miami Beach, Florida <br />Program & Construction Manager for the 48 story, 386 Unit, AKOYA Condominium Project in <br />Miami Beach, Florida. The Project included an adjacent 6 story parking garage. Total Project <br />cost volume was $175 Million. The Project commenced in December of 2002 and was <br />successfully completed by December of 2004. <br />b) A separate list of additional references is attached. <br />Alta Management Company, Inc. <br />Request for Proposal No. 12 -06 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.