My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Air Mechanical & Service Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-12-02) HVAC Chiller Systems for Pelican Community Park
>
Responses
>
Air Mechanical & Service Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:49:50 PM
Creation date
3/7/2017 3:49:45 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
HVAC Chiller Systems for Pelican Community Park
Bid No. (xx-xx-xx)
16-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJNNY ,SZe <br /> de, <br /> et V 4 <br /> i P <br /> 46 1* FLOWN <br /> c,rY OF SUN NOV <br /> Addendum No. 1 <br /> CITY.OF SUNNY ISLES BEACH <br /> New HVAC Chiller Systems for Pelican Community Park <br /> CITY ITB NO. 16-12-02 <br /> To All Bidders: <br /> Bidders for the above-referenced project shall take note of the following changes, <br /> additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br /> accordance with the Contract Documents shall become a part of and have precedence <br /> over anything shown or described otherwise. <br /> Clarification: <br /> • Q1: Is the warranty bond required? <br /> Al: The following language from section - 2.17.1 Type of Warranty Coverage <br /> Required has been removed (Note: Changes to document language are both <br /> underlined and crossed-ems} <br /> Contractor's warranties shall be one (1) year from final completion, basked-by-a <br /> war-r-antybend and shall include all delivery, labor, material, and equipment for <br /> the correction, replacement, reinstallation, and/or removal of defective and/or <br /> unacceptable work. The Contractor shall provide a copy of its written warranty <br /> certificates at contract closeout. <br /> END OF SECTION <br /> 411 <br /> Friday, February 10, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.