My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Air Mechanical & Service Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-12-02) HVAC Chiller Systems for Pelican Community Park
>
Responses
>
Air Mechanical & Service Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:49:50 PM
Creation date
3/7/2017 3:49:45 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
HVAC Chiller Systems for Pelican Community Park
Bid No. (xx-xx-xx)
16-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 . Nr 144. <br /> 305.947.0606 °� f m, <br /> www.sibfl.net :k., o <br /> 'yf D . F`O', 4.. <br /> c"}'of so PaO <br /> Air Mechanical & Service Corp <br /> BID FORM 5 <br /> BID PRICING <br /> BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS <br /> INCLUDING ALL LABOR, EQUIPMENT, SUPERVISION,TESTING AND PERMITTING TO PROVIDE A <br /> COMPLETE TURN-KEY PROJECT CONFORMING TO THE REQUIREMENTS DETAILED BY THE <br /> SPECIFICATIONS, MANUFACTURER, OWNER, STATE, FEDERAL AND LOCAL AGENCIES FOR THE <br /> FOLLOWING LUMP SUM AND/OR UNIT PRICES.WORK INCLUDES BUT IS NOT LIMITED TO <br /> GENERAL, ELECTRICAL AND MECHANICAL CONSTRUCTION. <br /> BID DESCRIPTION UNIT EST. UNIT EXTENDED <br /> ITEM# QUANTITY COST COST <br /> Temporary Chiller System <br /> 0 <br /> Temporary Chiller service required during the o <br /> 1 replacement period of the existing chillers LS 1 $o $ 24, 000. 00 <br /> • (including installation,operation, and removal) <br /> N <br /> • <br /> Subtotal of Temporary Chiller St tem / 2 4, 0 0 0.C 0 <br /> Demolition of Existing HVAC Chiller Systems o <br /> o 0 <br /> 2 Removal of existing modular Air Cooled Chiller LS 1 $co o $ 1 8, 000. 00 <br /> •3 Removal of existing Pumps LS 1 $ o $ 4, 000. 00 <br /> Subtotal of New HVAC Chiller Systems 22, 000.00 <br /> New HVAC Chiller Systems <br /> New Chiller CH-1 (see schedule notes on M-2)to <br /> installed on a new modified structural concrete <br /> pad including but not limited too new two 0 <br /> 4 alternate chilled water pumps, piping, and the LS 1 $ oo $ 233, 700. 00 <br /> upgrade of the 200A service of existing panel to N <br /> a new 250A service new chiller load(see rn <br /> rn <br /> schedule notes on E-1) <br /> Subtotal of New HVAC Chiller Systems 2 3 3, 7 0 0.0 0 <br /> 4111 <br /> City of Sunny Isles Beach I Invitation to Bid No. 16-12-02 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.