Laserfiche WebLink
TENEX ENTERPRISES, INC. <br />SUBTOTAL A) THROUGH B) $ <br />BOND & INSURANCE (2.5 %) $ <br />TOTAL COST OF INCREASE, DECREASE $ <br />OR ALTERATION IN WORK <br />tits I Unit Measure I Unit Price I TOTAL <br />- w w v,vvv.vv i� <br />IL <br />7 Complete electrical (electrical plan ,panel , etc, <br />for Installation of (84) Flood Lights as specified <br />by city 1.00 LS $ 67,000.00 $ 67,000.00 <br />TOTAL $ A �w <br />(o1)006•CO <br />Bj SUBCONTRACTOR <br />Change Order #2 - RFP 11 -11 -03 2 of 2 CO #2 Breakdown <br />