My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1960
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2012 4:47:04 PM
Creation date
10/11/2012 4:14:40 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1960
Date (mm/dd/yyyy)
10/20/2012
Description
CO #2 w/Tenex to Install Trees in Intracoastal Park; Rescind R2012-1921
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TENEX <br />ENTERPRISES <br />85)O :SAN'. 1 ith Court • Pompano 13earh Flcnid;i 3i 060 <br />Phone: (95'1) 788 -8100 Fax: (93) 1.) 788-0005 <br />REQUEST FOR CHANGE ORDER # 2 <br />TO: Mr. Alan Cohen - City Manager DATE: June 13, 2012 <br />City of Sunny Isles Beach OWNER: City of Sunny Isles Beach <br />18070 Colins Avenue PROJECT: Collins Avenue Sidewalk Pavers <br />Sunny Isles Beach, FL 33160 <br />PROJECT No: Contract no. C1112 -011 JRFP 11 -11 -03 <br />SCOPE :I Intracoastal Park - Landscape, Hardscape, Lighting <br />uescri <br />Per Owner directive: Removal & Relocation of var. Trees. Installation of Landscaping (Palms, Ficus, Sod, <br />Mulch, Sand & Top Soil). Installation of floodlight fixtures as specified by the City of Sunny Isles Beach <br />(incl. Conduit). Irrigation System installation. Installation of Brick Paver Sidewalk. <br />,7-A9) 3"10" 15 <br />Total Amount Requested for Change Order # 2 $ 3;Z2,4�'r�v <br />Note: Except as qualified above, all changes to work to be performed under the same terms and conditions <br />as the base contract. <br />WE AGREE to modify the original contract by the following CHANGE ORDER amount: <br />$ 37214 6 436 " A-Zo <br />with -60- additional days to complete this work <br />Signature � <br />Authorized Tenex Enterprises, Inc. <br />Representative <br />Date: <br />ACCEPTED: The above prices and specifications of this Request for Change Order are satisfactory and <br />are hereby accepted. Tenex Enterprises, Inc., will perform above stated work under the same terms and <br />conditions as specified in original contract unless oterhwise noted. Additional work is to be paid for under <br />the same terms and conditions of the existing contract. <br />Signature: ffjff lv <br />Auth rized Owne <br />Representative <br />Change Order #2 - RFP 11 -11 -03 1 of 1 <br />Date: <br />CO #2 <br />ATTACHMENT "A" Val <br />
The URL can be used to link to this page
Your browser does not support the video tag.