Laserfiche WebLink
restricted available right of way or easement width at the south landing which will only <br />accommodate one way bi- directional traffic and pedestrians. <br />Work Authorization No. 145 Increased Scope <br />The original contract for the bridge design did not include a detailed construction cost <br />analysis as a part of design phase services. This Work Authorization is to perform a <br />complete bid take off, analysis and constructability review by a licensed and well known <br />marine contractor. Given the complexity of this project, this detailed review will provide <br />for accurate and updated cost figures, investigate for and identify potential areas for value <br />engineering, define construction methods to ensure permits and easements are obtained <br />properly, and result in potential bidders submitting Requests for Information and areas of <br />potential change orders prior to bid opening. This allows the design team to make <br />adjustments to the plans prior to bid opening, which can result in a large savings to the <br />City. <br />COST: <br />In an amount not to exceed $34,644.75. <br />http: / /sibagenda. sibfl. net / agenda /Preview.aspx ?ItemID= 894 &MeetingID= O &MeetingDat... 10/12/2012 <br />