SECTION 01010 <br /> SUMMARY OF WORK <br /> PART 1 - GENERAL <br /> 1.01 WORK COVERED BY CONTRACT DOCUMENTS/REQUIREMENTS INCLUDED <br /> Sealed bids for the construction of water & sewer, telecommunications (AT&T, ABB), for the new City of <br /> Sunny Isles Beach Newport Fishing Pier and Restaurant Utilities. The scope of work shall include installation <br /> of approximately 400 linear feet of an eight (8) inch PVC water main, 70 linear feet of four(4 inch) PVC fire <br /> main, fire hydrant assembly and a 60 linear feet of a four (4) inch PVC sewer lateral extension. All paver <br /> driveway/ parking area restoration, landscape restoration, curb & gutter restoration, and maintenance of <br /> traffic shall be considered and included in this bid. <br /> The layout and required pipe lengths shall be the responsibility of the Contractor to match <br /> the required dimensions. The Contractor shall provide all work and materials. <br /> The dimensions of the existing piping shown on the plans are approximate. The <br /> Contractor shall use his own measurements in determining needed pipe. <br /> 1.02 CONTRACTOR USE OF SITE <br /> Contractor shall construct work according to the plan included in the plan set as well as the <br /> provisions of these specifications. Contractor shall maintain access to all parts of La Perla <br /> Condominium throughout the project. Contractor shall also maintain continuous water and <br /> public restroom showers and sewer service to all residents throughout the duration of the <br /> project, unless previously authorized by the City and Engineer of Record. Contractor to <br /> ensure all holes, ditches, etc., that pose any type of risk to the public are properly closed <br /> up and marked at the end of each day's work. Pavement shall be swept and debris <br /> removed from the site daily and material shall be stored in a presentable and orderly <br /> manner. The Contractor shall supply the Owner with a work schedule and provide at least <br /> 48 hours notice before taking any portion of the system parking lot or ingress/egress out of <br /> service to La Perla condominium. <br /> 1.03 STORAGE OF EQUIPMENT AND MATERIALS <br /> A. The City will provide the Contractor with their options for staging prior to bid <br /> closing. If additional staging areas are required the Contractor will be responsible <br /> to secure these. These costs should be included in the base bid amount and will <br /> be the sole responsibility of the contractor. <br /> B. The Contractor shall limit his use of the premises for short-term storage of <br /> materials being used during the specific operations of the Contractor being <br /> conducted at that time. The Contractor shall allow for: <br /> 1. Access to all parts of area, unless previously authorized by the City or the <br /> Engineer of Record. <br /> C. Assume full responsibility for the protection and safekeeping of the products under <br /> this contract, stored on the site. <br /> 08/12 01010-1 06-5355.15 <br />