My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Show the complete sequence of construction by activity. <br /> 2. Show the dates for the beginning of, and completion of, each major <br /> element of construction in no more than a two week increment scale. <br /> Specifically list, but not limited to: <br /> a. Site Clearing <br /> b. Site Utilities <br /> c. Foundation Work <br /> d. Structural Framing <br /> e. Subcontractor Work <br /> f. Equipment Installations <br /> g. Finishings <br /> h. Instrumentation <br /> Painting <br /> j. Schooling/O & M Manuals <br /> k. Testing <br /> Startup <br /> m. Receipt of Spare Parts <br /> n. Site Work <br /> o. Record Drawings <br /> p. Restoration <br /> q. Float <br /> 3. Show projected percentage of completion for each item, as of the first of <br /> each month. <br /> 4. Show projected dollar cash flow requirements for each month of <br /> construction. <br /> 5. Use of float suppression techniques such as preferential sequencing or <br /> logic, special lead/lag logic restraints, and extended activity times are <br /> prohibited, and use of float time disclosed or implied by use of alternate <br /> float-suppression techniques shall be shared to proportionate benefit of <br /> the Owner and Contractor. <br /> 6. Pursuant to above float-sharing requirement, no time extensions will be <br /> granted nor delay damages paid until a delay occurs which (i)impacts <br /> Project's critical path, (ii) consumes available float or contingency time, <br /> and (iii) extends work beyond contract completion date. <br /> 7. If the Contractor provides an accepted schedule with an early completion <br /> date, the Owner reserves the right to reduce the duration of the work to <br /> match the early completion date by issuing a deductive Change Order at <br /> no change in Contract Price. <br /> B. Submittals Schedule for Shop Drawings, and Samples in accordance with <br /> Section 01340. Show: <br /> 1. The dates for Contractor's submittals. <br /> 2. The dates submittals will be required for owner furnished products, if <br /> applicable. <br /> 3. The dates approved submittals will be required from the Engineer. <br /> C. A list of all long lead items (equipment, materials, etc). <br /> 1.05 PROGRESS REVISIONS <br /> A. Indicate progress of each activity to date of submission. <br /> 08/12 01310-2 11-4179 <br />