My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The review of drawings and schedules will be general and shall not be construed: <br /> 1. as permitting any departure from the Contract requirements; <br /> 2. as relieving the Contractor of responsibility for any errors, including <br /> details, dimensions, and materials; <br /> 3. as approving departures from details furnished by the Engineer, except <br /> as otherwise provided herein. <br /> C. If the drawings or schedule as submitted describe variations per subparagraph <br /> (1.05.C), and show a departure from the Contract requirements which Engineers <br /> finds to be in the interest of the Owner and to be minor as not to involve a <br /> change in the Contract Price or time for performance, the Engineer may return <br /> the reviewed drawings without noting an exception. <br /> D. When reviewed by the Engineer, each of the Shop Drawings will be identified as <br /> having received such review being so stamped and dated. Shop Drawings <br /> stamped "REJECTED" and with required corrections shown will be returned to <br /> the Contractor for correction and resubmittal. <br /> E. Resubmittals will be handled in the same manner as the first submittals. On <br /> resubmittals, the Contractor shall direct specific attention, in writing or on <br /> resubmitted Shop Drawings, to revisions other than the corrections requested by <br /> the Engineer on previous submissions. The Contractor shall make any <br /> corrections required by the Engineer. <br /> F. If the Contractor considers any correction indicated on the drawings to constitute <br /> a change to the Contract Drawings or Specifications, the Contractor shall give <br /> written notice thereof to the Engineer. <br /> G. The Engineer will review a submittal/resubmittal a maximum of two (2) times after <br /> which cost of review will be borne by the Contractor. The cost of engineering <br /> shall be equal to the Engineer's charges to the Owner under the terms of the <br /> Engineer's agreement with the Owner. <br /> H. When the Shop Drawings have been completed to the satisfaction of the <br /> Engineer, the Contractor shall carry out the construction in accordance therewith <br /> and shall make no further changes therein except upon written instructions from <br /> the Engineer. <br /> No partial submittals will be reviewed. Submittals not complete will be returned <br /> to the Contractor, and will not be considered "Rejected" until resubmitted. <br /> 1.05 SHOP DRAWINGS <br /> A. When used in the Contract Documents, the term "Shop Drawings" shall be <br /> considered to mean Contractor's plans for material and equipment, which <br /> become an integral part of the Project. These drawings shall be complete and <br /> detailed. Shop Drawings shall consist of fabrication, erection and setting <br /> drawings and schedule drawings, manufacturer's scale drawings, and wiring and <br /> control diagrams. Cuts, catalogs, pamphlets, descriptive literature, and <br /> 08/12 01340-3 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.