Laserfiche WebLink
performance and test data, shall be considered only as supportive to required <br /> Shop Drawings as defined above. <br /> B. Drawings and schedules shall be checked and coordinated with work of all trades <br /> involved, before they are submitted for review by the Engineer and shall bear the <br /> Contractor's stamp of approval as evidence of such checking and coordination. <br /> Drawings or schedules submitted without this stamp of approval shall be returned <br /> to the Contractor for resubmission. <br /> C. Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, <br /> located adjacent to the title block. The title block shall display the following: <br /> 1. Number and title of the drawing. <br /> 2. Date of drawing or revision. <br /> 3. Name of project building or facility. <br /> 4. Name of contractor and subcontractor submitting drawing. <br /> 5. Clear identification of contents and location of work. <br /> 6. Specification title and number. <br /> D. If drawings show variations from Contract requirements because of standard <br /> shop practice or for other reasons, the Contractor shall describe such variations <br /> in his letter of transmittal. If acceptable, proper adjustment in the Contract shall <br /> be implemented where appropriate. If the Contractor fails to describe such <br /> variations he shall not be relieved of the responsibility for executing the work in <br /> accordance with the Contract, even though such drawings have been reviewed. <br /> E. Data on materials and equipment include, without limitation, materials and <br /> equipment lists, catalog data sheets, cuts, performance curves, diagrams, <br /> materials of construction and similar descriptive material. Materials and <br /> equipment lists shall give, for each item thereon, the name and location of the <br /> supplier or manufacturer, trade name, catalog reference, size, finish and all other <br /> pertinent data. <br /> F. For all mechanical and electrical equipment furnished, the Contractor shall <br /> provide a list including the equipment name, address and telephone number of <br /> the manufacturer's representative and service company so that service and <br /> spare parts can be readily obtained. In addition, a maintenance and lubrication <br /> schedule for each piece of equipment shall be submitted along with each shop <br /> drawing submittal. <br /> G. All manufacturers or equipment supplier who propose to furnish equipment or <br /> products under Divisions 11, 12, 13, 14, 15, and 16 shall submit an installation <br /> list to the Engineer along with the required shop drawings. The installation list <br /> shall include at least five installations where identical equipment has been <br /> installed and has been in operation for a period of at least one (1) year. <br /> H. Only the Engineer will utilize the color "red" in marking Shop Drawing submittals. <br /> Before final payment is made, the Contractor shall furnish to Engineer two (2) <br /> sets of record shop drawings all clearly revised, complete and up to date showing <br /> the permanent construction as actually made for all reinforcing and structural <br /> 08/12 01340-4 11-4179 <br />