My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01510 <br /> TEMPORARY UTILITIES <br /> PART 1 -GENERAL <br /> 1.01 REQUIREMENTS INCLUDED <br /> A. Furnish, install and maintain temporary utilities required for construction, remove on <br /> completion of work. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 01010: Summary of Work <br /> 1.03 REQUIREMENTS OF REGULATORY AGENCIES <br /> A. Comply with National Electric Code. <br /> B. Comply with Federal, State and Local codes and regulations and with utility <br /> company requirements. <br /> C. Comply with County Health Department and Environmental Regulations. <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS <br /> A. Materials may be new or used, but must be adequate in capacity for the required <br /> usage, must not create unsafe conditions, and must not violate requirements of <br /> applicable codes and standards. <br /> 2.02 TEMPORARY ELECTRICITY AND LIGHTING <br /> A. Arrange with utility company, provide service required for power and lighting, and <br /> pay all costs for service and for power used in the construction, testing and trial <br /> operation prior to final acceptance of the work by the Owner. <br /> B. Install circuit and branch wiring, with the area distribution boxes located so that <br /> power and lighting is available throughout the construction by the use of <br /> construction type power cords. <br /> C. Provide adequate artificial lighting for all areas of work when natural light is not <br /> adequate to work, and all areas accessible to the public. <br /> 2.03 TEMPORARY WATER <br /> 08/12 01510-1 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.