My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOCUMENT 01720 <br /> PROJECT RECORD DOCUMENTS <br /> PART 1 - GENERAL <br /> 1.01 REQUIREMENTS INCLUDED <br /> A. Maintain at the site for the Owner one record copy of <br /> 1. Drawings <br /> 2. Specifications <br /> 3. Addenda <br /> 4. Change Orders and other Modifications to the Contract <br /> 5. Engineer's Field Orders or Written Instructions <br /> 6. Approved Shop Drawings, Working Drawings, and Samples <br /> 7. Field Test Reports <br /> 8. Construction Photographs <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 01050: Field Engineering <br /> B. Section 01340: Shop Drawings, Working Drawings and Samples <br /> C. Section 01700: Contract Closeout <br /> D. Section 01152: Applications for Payment <br /> 1.03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> A. Store documents and samples in Contractor's field office apart from documents <br /> used for construction. <br /> B. File documents and samples in accordance with CSI format number system. <br /> C. Maintain documents in a clean, dry, legible condition and in good order. Do not <br /> use record documents for construction purposes. <br /> D. Make documents and samples available at all times for inspection by the <br /> Engineer. <br /> E. As a prerequisite for monthly progress payments, the Contractor is to exhibit the <br /> currently updated "record documents" for review by the Engineer and the Owner. <br /> 1.04 RECORDING <br /> A. Label each document "PROJECT RECORD" in neat large printed letters. <br /> B. Record information concurrently with construction progress. <br /> 08/11 01720-1 06-5355.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.