My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Drawings; Legibly mark record actual construction: <br /> 1. Depths of various elements of foundation in relation to finish first floor <br /> datum. <br /> 2. All underground piping with elevations and dimensions. Changes to <br /> piping location. Horizontal and vertical locations of underground utilities <br /> and appurtenances, referenced to permanent surface improvements. <br /> Actual installed pipe material, class, etc. <br /> 3. Location of internal utilities and appurtenances concealed in the <br /> construction, referenced to visible and accessible features of the <br /> structure. <br /> 4. Field changes of dimensions and details. <br /> 5. Changes made by Field Order or by Change Order. <br /> 6. Details not on original contract drawings. <br /> 7. Equipment and piping relocations. <br /> 8. Building and tank locations. <br /> D. Specifications and Addenda; legibly mark each Section to record: <br /> 1. Manufacturer, trade name, catalog number and supplier of each product <br /> and item of equipment actually installed. <br /> 2. Changes made by field order or by Change Order. <br /> E. Shop Drawings (after final review and approval): <br /> 1. One set of record shop drawings for each process equipment, piping, <br /> (including casings) electrical system and instrumentation system. <br /> F. Certified site survey and line elevations, and stationing at increments per Section <br /> 01050, by registered surveyor. <br /> 1.05 SUBMITTAL <br /> A. At Close-out, deliver Record Documents to the Engineer for the Owner. <br /> B. Accompany submittal with transmittal letter in duplicate, containing: <br /> 1. Date <br /> 2. Project Title and Number <br /> 3. Contractor's Name and Address <br /> 4. Title and Number of each Record Document <br /> 5. Signature of Contractor or his Authorized Representative <br /> C. Submittal of Record Drawings shall be in accordance with Section 01050, 1.06. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION <br /> 08/11 01720-2 06-5355.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.