My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02580 <br /> PAVEMENT MARKINGS AND SIGNING <br /> PART 1 -GENERAL <br /> 1.01 SCOPE <br /> A. The Contractor shall supply all labor, equipment, materials and incidentals <br /> necessary to install pavement markings and signing in accordance with the plans <br /> and the following specifications. <br /> 1.02 REFERENCED SPECIFICATIONS, CODES AND STANDARDS <br /> A. Manual on Uniform Traffic Control Devices, latest edition <br /> B. FDOT Design Standards, latest edition <br /> C. FDOT Standard Specifications for Road and Bridge Construction, latest edition <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS <br /> A. Paint shall be , Sherwin-Williams "Pro-Mar" Traffic Marking Paint, series B29 or <br /> Glidden Traffic paint#63228, or approved equal. <br /> B. Thermoplastic traffic stripes and markings shall meet the requirements of AASHTO <br /> M249-79 (1986) and exceptions as indicated in the "FDOT Standard Specifications <br /> for Road and Bridge Construction", . <br /> PART 3 - EXECUTION <br /> A. Parking stalls shall be marked in accordance with the typical pattern indicated on the <br /> criteria drawings. Stall width and depth, and drive widths indicated are minimum <br /> and must not be reduced. Provide two (2) coats of paint, 15 mil minimum dry film <br /> thickness. <br /> B. Directional arrows shall be marked on pavement in location and of size indicated on <br /> drawings. <br /> C. Paint all precast concrete bumpers (except where used as a continuous curb). <br /> D. Paint all sitework protective guard posts beyond five (5)feet of the building. <br /> E. Entrances shall be property marked by painting directional arrows on the pavement.. <br /> END OF SECTION <br /> 08/12 025841 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.