My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FISHING PIER AND RESTAURANT UTILITIES <br /> UNIT PRICE BID SCHEDULE <br /> Bid Estimated Estimated <br /> Item Description Quantity Unit Unit Price Total <br /> I. General Conditions <br /> 1 Mobilization and Demobilization (Includes general <br /> conditions, permit fees, NPDES Compliance, <br /> administration, etc.) 1 LS _ <br /> 2 Maintenance of traffic per FDOT including temporary <br /> striping and signage, barricades, barriers, arrow <br /> panels, etc. as required, in coordination with FDOT & <br /> Sunny Isles Beach Police Department. <br /> 1 LS <br /> Sub-Total General Conditions <br /> II. Civil <br /> 3 Furnish and Install 8" PVC Water Main <br /> (Inclusive of all bends, fittings, appurtenances, <br /> backfill, compaction, excavation, bedding, <br /> compaction, testing, certification permitting/approval <br /> and restoration) 418 LF <br /> 4 Furnish and Install 4" DIP Fire Main <br /> (Inclusive of all backfill, compaction, excavation, <br /> bedding, compaction, testing, certification <br /> permitting/approval and restoration) 85 LF <br /> 5 Furnish and Install 12"x8" TS&V (in FDOT ROW) <br /> 1 LS <br /> 6 Furnish and Install FH Assembly (complete) <br /> (Inclusive of all backfill, compaction, excavation, <br /> bedding, compaction, testing, certification <br /> permitting/approval and restoration) 1 LS <br /> 7 Furnish and Install 8" gate valve in FDOT r/w 1 EA <br /> 8 Furnish and Install 8"x6" tee <br /> 1 EA <br /> 9 Furnish and Install 6" gate valve <br /> 1 EA <br /> 10 Furnish and Install 4"x4" tee <br /> 1 EA <br /> 11 Furnish and Install 4" gate valve 1 EA <br /> 12 DIP fittings (complete w/restraints) 1 LS <br /> 13 Sample Points <br /> 3 EA <br /> 14 Furnish and Install 1" HDPE Service <br /> (Inclusive of all backfill, compaction, excavation, <br /> bedding, compaction, testing, certification <br /> permitting/approval, restoration and connection at <br /> existing bathroom) 90 LF <br /> 08/12 00300-2 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.