My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2682
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 2:54:38 PM
Creation date
5/9/2017 2:53:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2682
Date (mm/dd/yyyy)
04/20/2017
Description
Agmt with Safeware, Inc. for Installation of Phase II of the Citywide CCTV System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manager means an employee or representative of the City assigned to manage and monitor <br /> the Services to be performed under this Agreement and the construction of the Project. <br /> Project means the complete supply and installation, including incidentals thereto, to provide <br /> a multiple zone security solution with an expandable high bandwith video surveillance system <br /> for public safety and emergency preparedness and related services at various locations <br /> throughout the City, as more fully described in the Contract Documents. <br /> Request For Information (RFI) means a request from the Contractor seeking an interpretation <br /> or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br /> which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br /> requiring clarification or interpretation and why the response is needed. The RFI must set forth the <br /> Contractor's interpretation or understanding of the document(s) in question, along with the <br /> reason for such understanding. <br /> Specifications and Plans as used herein means that portion of the Contract Documents which <br /> are the written requirements for the materials, equipment, systems, standards and workmanship for <br /> completion of the Services and performance of related services for this Project. <br /> Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a <br /> direct contract with the Contractor to perform or supply any portion of the Services in connection <br /> with this Project. <br /> Time for Completion means the time to complete all Services no later than Ninety (90) days <br /> from the Commencement Date specified in the Notice to Proceed issued by the City Manager or <br /> his designee. <br /> Final Completion means the date certified by the City Manager or his designee that all <br /> documents required by the Contract Documents have been received by the City Manager or <br /> his designee; any other documents required to be provided by Contractor have been received <br /> by City Manager or his designee; and to the best of City Manager or their designee's <br /> knowledge, information and belief the Services defined herein has been fully completed in <br /> accordance with the terms and conditions of the Contract Documents. <br /> Services as used herein refers to all services required by the Contract Documents, including all <br /> labor, materials, equipment, supervision and services needed to complete the Project in <br /> accordance with the Contract Documents. <br /> ARTICLE 2. SCOPE OF WORK <br /> Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br /> supervision, and all other necessary goods and services to perform the Work in the manner <br /> provided by this Agreement and the Contract Documents. <br /> C5800-1617-058—SAFEWARE, INC. Page 3 of 25 S 1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.