Laserfiche WebLink
Contract Documents means this Agreement, the pricing terms and conditions per County of <br /> Fairfax, Virginia, Contract No. 4400001839, any Addenda, Supplemental Terms and Conditions, <br /> the Contractor's Proposal to the City attached hereto as Attachment "A", the Payment and <br /> Performance Bond, any approved written interpretations and clarifications, Field Directives, <br /> Construction Change Directives, any Change Orders issued thereto, and any modifications, duly <br /> issued after execution of the Agreement. <br /> Contract Time means the time period defined in this Agreement for the Contractor to complete <br /> the Services. <br /> Contractor means Safeware, Inc., the contractor selected by the City to provide all labor,materials, <br /> equipment and services to complete the Services described in the Contract Documents. <br /> Contractor Project Manager means the person designated by Contractor as its lead <br /> representative to the City. The Contractor Project Manager shall have the authority to obligate and <br /> bind the Contractor and to act on all matters on behalf of Contractor except for revisions to the <br /> Contract Documents and Change Orders. <br /> Construction Change Directive means a written directive to effect changes to the Services, <br /> prepared by and executed by the City. <br /> Construction Work means all work required by this Agreement for the completion of Services. <br /> Cure means the action taken by the Contractor, promptly after receipt of written notice from the <br /> City of a breach of the Agreement, which shall be performed at no cost to the City, to repair, <br /> replace, correct, and/or remedy all material, equipment, or other elements of the Services or the <br /> Agreement affected by such breach, or to otherwise make good and eliminate such breach, <br /> including, without limitation, repairing, replacing or correcting any portion of the Services or the <br /> Project site disturbed in performing such cure. <br /> Cure Period means a period of seven (7) days, after receipt of written notice to cure from the City, <br /> in which the Contractor is required to cure deficiencies in the Services or compliance with this <br /> Agreement or the Contract Documents. <br /> Drawings means the graphic and pictorial portions of the Services, which serve to show the <br /> design, location and dimensions of the work to be performed, including, without limitation, all <br /> notes, schedules and legends on such Drawings. <br /> Field Directive means a written approval for the Contractor to proceed with work requested by <br /> the City, which is minor in nature and should not involve additional cost. <br /> Insurance Requirements means the requirements described in this Agreement and the Contract <br /> Documents. <br /> Notice To Proceed means a written letter or directive issued by the City Manager or his designee <br /> directing that the Contractor may begin Services on the Project or a specific task of the Project. <br /> C5800-1617-058—SAFEWARE. INC. Page 2 of 25 S 1 <br />