My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(14-06-02) Emergency Debris Clearing and Removal
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 10:20:54 AM
Creation date
6/12/2017 10:20:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monday, June 30, 2014 <br />disposal. Reason: a contractor could pick a disposal site 200 or 300 miles away instead <br />of using a disposal site that is only 25 to 50 miles away. <br /> <br />Refer to the fee schedule form in the RFP. Quote based on less than 25 miles. <br /> <br />Line Item 6: <br />Debris Removal from Drainage Facilities Cubic Yard <br /> <br />Can you please clarify the definition of Drainage Facilities? i.e.: Miter ends, ditches, <br />canals, ocean etc. These all take several different types of equipment to perform and <br />very different rates. <br /> <br />Storm drain boxes, inlet drainage wells and one (1) drainage pump station. <br /> <br />Finally since we are to base our total on 40,000 cubic yards, should we add a colum to <br />show the extended pricing? <br /> <br />No. <br /> <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.