My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Contract Price: The total monies payable to the CONTRACTOR under the Contract <br />Documents. <br /> <br />Contract Time: The number of calendar days stated in the Agreement for the completion <br />of the Work. <br /> <br />CONTRACTING OFFICER: The owner (Grantee) - The individual who is authorized to <br />sign the contract documents on behalf of the owner's governing body. <br /> <br />CONTRACTOR: The person, firm or corporation with whom the OWNER has executed <br />the Agreement. <br /> <br />Day: A calendar day of twenty-four hours measured from midnight to the next midnight. <br /> <br />Drawings: The drawings which show the character and scope of the Work to be <br />performed and which have been prepared or approved by the ENGINEER and are <br />referred to in the Contract Documents. <br /> <br />ENGINEER: Craig A. Smith & Associates, 1000 West McNab Road, Pompano Beach, <br />Florida 33069 (954)782-8222. <br /> <br />Field Order: A written order issued by the ENGINEER which clarifies or interprets the <br />Contract Documents in accordance with paragraph 9.3 or orders minor changes in the <br />Work in accordance with paragraph 10.2. <br /> <br />Modification: (a) A written amendment of the Contract Documents signed by both parties, <br />(b) a Change Order, (c) a written clarification or interpretation issued by the ENGINEER in <br />accordance with paragraph 9.3 or (d) a written order for minor change or alteration in the <br />Work issued by the ENGINEER pursuant to paragraph 10.2. A modification may only be <br />issued after execution of the Agreement. <br /> <br />Notice of Award: The written notice by OWNER to the apparent successful Bidder stating <br />that upon compliance with the conditions precedent to be fulfilled by him within the time <br />specified, OWNER will execute and deliver the Agreement to him. <br /> <br />Notice to Proceed: A written notice given by OWNER to CONTRACTOR (with copy to <br />ENGINEER) fixing the date on which the Contract Time will commence to run and on <br />which CONTRACTOR shall start to perform his obligations under the Contract <br />Documents. <br /> <br />OWNER: CITY OF SUNNY ISLES BEACH <br /> 18070 Collins Avenue, Sunny Isles Beach, FL 33160 <br /> <br />Project: The entire construction to be performed as provided in the Contract Documents. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700-2 General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.