<br />Qualification of Subcontractors, Materialmen and Suppliers: <br /> <br /> 2.10 Within ten working days after bid opening, the CONTRACTOR will submit to <br />the OWNER and the ENGINEER for acceptance a list of the names of <br />subcontractors and such other persons and organizations (including those who are <br />to furnish principal items of materials or equipment) proposed for those portions of <br />the Work as to which the identity of the Subcontractors and other persons and <br />organizations must be submitted as specified in the Contract Documents. Within <br />thirty working days after receiving the list, the ENGINEER will notify the <br />CONTRACTOR in writing if either the OWNER or the ENGINEER, after due <br />investigation, has reasonable objection to any Subcontractor, person, or <br />organization on such list. The failure of the OWNER or the ENGINEER to make <br />objection to any Subcontractor, person or organization on the list within thirty days <br />of receipt shall constitute an acceptance of such Subcontractor, person or <br />organization. Acceptance of any such Subcontractor, person or organization shall <br />not constitute a waiver of any right of the OWNER or the ENGINEER to reject <br />defective Work, material or equipment, or work, material or equipment not in <br />conformance with the requirements of the Contract Documents. <br /> <br />Rejection of Subcontractor: <br /> <br /> 2.11 If, prior to the Notice of Award, the OWNER or the ENGINEER has <br />reasonable objection to and refuses to accept any Subcontractor, person or <br />organization listed, the apparent low Bidder may, prior to Notice of Award either (i) <br />submit an acceptable substitute without an increase in his bid price or (ii) withdraw <br />his Bid without forfeiting his Bid security. <br /> <br />ARTICLE 3 - CORRELATION, INTERPRETATION AND INTENT OF CONTRACT <br />DOCUMENTS <br /> <br /> 3.1 It is the intent of the Specifications and Drawings to describe a complete <br />Project to be constructed in accordance with the Contract Documents. The <br />Contract Documents comprise the entire Agreement between the OWNER and the <br />CONTRACTOR. They may be altered only by a Modification. <br /> <br /> 3.2 The Contract Documents are complementary; what is called for by one is as <br />binding as if called for by all. If CONTRACTOR finds a conflict, error or <br />discrepancy in the Contract Documents, he shall call it to the ENGINEER's <br />attention in writing at once and before proceeding with the Work affected thereby; <br />however, he shall not be liable to OWNER or ENGINEER for his failure to discover <br />any conflict, error or discrepancy in the Specifications or Drawings. The various <br />Contract Documents shall be given precedence in case of conflict, error or <br />discrepancy, as follows: Supplemental General Conditions, Agreement <br />Modifications, Addenda, Special Conditions, Instructions to Bidders, General <br />Conditions, Specifications and Drawings. If the requirements of other Contract <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700-6 General Conditions <br />14-1758 / 09-19-2014 <br />