Laserfiche WebLink
City of Sunny Isles Beach | Invitation to Bid No. 17‐05‐01  4   <br />  <br /> 2.27 Access to the Project Sites………………………………………………………….. 29 <br /> 2.28 Clean-up…………………………………………………………………………………… 30 <br /> 2.29 Maintenance & Service Plan……………………………………………………….. 30 <br /> 2.30 Annual Execution Plan……………………………………………………………….. 31 <br /> 2.31 Quality Control Plan………………………………………………………………….. 31 <br /> 2.32 Weekly Work Plan……………………………………………………………………... 32 <br /> 2.33 Monthly Report………………………………………………………………………….. 32 <br /> 2.34 Emergency Response Plan ………………………………………………………….. 33 <br /> 2.35 Priority ……………………………………………………………………………………… 33 <br /> 2.36 Unsatisfactory Work to be Corrected by the Contractor………………….. 33 <br /> 2.37 Termination for Convenience………………………………………………………. 34 <br /> 2.38 Labor, Materials, & Equipment shall be Supplied by the Bidder……….. 34 <br /> 2.39 Licenses, Permits and Fees………………………………………………………….. 35 <br /> 2.40 Limited Contract Extension to Maintain Service Levels……………………. 35 <br /> 2.41 Materials shall be New and Warranted against Defects…………………… 35 <br /> 2.42 Additional Services Not Listed Within this Solicitation <br /> Based on Price Quotes ………………………………………………………………. 35 <br /> 2.43 Deletion of Services……………………………………………………………………. 36 <br /> <br />Section 3: Performance Standards/Technical Specifications <br /> 3.1 Scope of Services……………………………………………………………………….. 37 <br /> 3.2 Locations of the Work…………………………………………………………………. 37 <br /> 3.3 Satellite Storage and Operation Center………………………………………… 38 <br /> 3.4 Equipment…………………………………………………………………………………. 38 <br /> 3.5 Maintenance of Traffic………………………………………………………………… 39 <br /> 3.6 Force Majeure………………….………………………………………………………… 40 <br /> 3.7 Irrigation System Maintenance…………………………………………………….. 40 <br /> 3.8 Pesticides and Fertilizers……………………………………………………………… 43 <br /> 3.9 Weed Control……………………………………………………………………………… 49 <br /> 3.10 Tree & Palm Maintenance……………………………………………………………. 50 <br /> 3.11 Shrub & Groundcover Maintenance………………………………………………..51 <br /> 3.12 Mulch………………………………………………………………………………………… 52 <br /> 3.13 Mowing……………………………………………………………………………………… 52 <br /> 3.14 Special Conditions for Bermuda Turf…………………………………………….. 54 <br /> 3.15 Edging………………………………………………………………………………………. 55 <br /> 3.16 Line Trimming……………………………………………………………………………. 56 <br /> 3.17 Catch Basins……………………………………………………………………………… 56 <br /> 3.18 Bus Shelter & Bench Locations…………………………………………………….. 56 <br /> 3.19 Graffiti Removal…………………………………………………………………………. 57 <br /> 3.20 Litter/Debris Removal…………………………………………………………………. 57 <br /> <br />Section 4: Basic Services <br /> 4.1 Basic Services (“Recurring Monthly”)……………………………………………. 59 <br /> <br />Section 5: Supplemental Services <br /> 5.1 Supplemental Services (“On Demand”)………………………………………… 63