Laserfiche WebLink
Created:7/6/12 CH <br /> Revised:8/14/12 AD/CH <br /> Revised:8/16/12 HO <br /> Revised: I0/30/I2 CH <br /> Revised: 10/31/12 HO/CH <br /> Revised:11/5/12 HO <br /> Side(West) <br /> Pedestal 0 feet 7 feet 0 inches. <br /> Complies. <br /> Tower 20 feet 20 feet 5 inches <br /> Complies. <br /> 265-37.F(6)(a)[1]:Setbacks and Summary Chart B <br /> I Required I Provided <br /> Phase III (Office Building) <br /> Front(North) <br /> Pedestal 15 feet 15 feet 3 inches <br /> Complies. <br /> Tower 25 feet 20 feet 0 inches <br /> (*)Does not Comply. <br /> Rear (South) <br /> Pedestal 0 feet 20 feet 6 inches <br /> Complies. <br /> Tower 10 feet 20 feet 6 inches <br /> Complies. <br /> Side (East) <br /> Pedestal 15 feet 15 feet 6 inches. <br /> Complies. <br /> Tower 20 feet 20 feet 6 inches. <br /> Complies. <br /> Side (West) <br /> Pedestal 0 feet 0 feet 0 inches. <br /> Complies. <br /> Tower 25 feet 28 feet 8 inches <br /> Complies. <br /> (*) Variance requested. <br /> 4. 265-37.F (7) Minimum lot size: Complies. <br /> Allowed: 10,000 square feet <br /> Provided: Phase II — 117,014 square feet. <br /> Phase III —31,113 square feet. <br /> 5. 265-37. F (8) Minimum lot width: Complies. <br /> Allowed: 100 feet(Chart E) <br /> Provided: Phase I I —530 feet <br /> Phase Ill — 162 feet <br /> 6. 265-37.F (9)(a)[1] Maximum height: Complies <br /> Required: 290 feet with average being 200 feet <br /> 5 <br /> U:IPLANNING&ZONING2008\ZONING HEARING-APPLICATIONS\2012 APPLICATION\Z2012-09 ST.TROPEZ PHASE II&III <br />