Laserfiche WebLink
QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D <br /> Professional Architecture Services for Government Center Lobby+Gateway Park <br /> 1 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Enrique Gomez, El Civil Engineer a. TOTAL b. WITH CURRENT FIRM <br /> 15. FIRM NAME AND LOCATION(City and State) 9 7 <br /> Miller Legg, Miami, FL <br /> 1 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Bachelor of Science,Civil Engineering(Awning if recur) FL,Engineer Intern <br /> Bachelor of Science,Gebmatia FL FOOT Asphaltic Concrete Plant Inspection <br /> FL FOOT CTQP Asphalt Paving Technician Level I <br /> FL FOOT Intermediate Maintenance of Traffic <br /> FL Survey Intern <br /> 1 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Mr.Gomez has worked as a Project Engineer for a variety of cbena such as municipalities,higher education and the private sector.His experience includes civil engineering services specfially in the preparation of <br /> site plans,paving,grading,and drainage plans,signing and marking plans,water and sewer plans,storntwater pollution prevention plans,and permitting. Mr.Gomez is also a Surveyor in Training and has a working <br /> knowledge of boundary surveys,ALTA surveys and as-built surveys. <br /> 19.RELEVANT PROJECTS <br /> 1 (1) TITLE AND LOCATION(CtyandState) (2)YEAR COMPLETED <br /> Cushman School Play to Learn Facility Civil Design& Engineering PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Miami, FL Ongoing Applicable) <br /> a. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Engineer.The Cushman School"Play to Learn"facility is a performing am theater/gymnasium/multipurpose venue with 24,400 SF of total new building. Demolition of <br /> existing outdoor areas and buildings on this 2-acre campus in Miami were required to enable construction of this new facility. Miller Legg performed civil engineering design and <br /> permitting services for this project. As pan of the civil work,demolition,water,sewer,paving,grading and drainage design for the site were carried out,and relocation of water and <br /> sewer infrastructure required.The site plan also contemplated dosing of NE 60th Street and NE 5th Court to improve traffic for the school. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Florida International University(FIU) Modesto Maidique Campus PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Wellness and Recreation Center Expansion 2017 Applicable) <br /> Miami, FL <br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Engineer.Miller Legg was the civil engineer consultant for this 25,000 sf expansion of the existing indoor recreation facilities for the FIU Modesto Maidique campus.The project <br /> also extended to the creation of outdoor recreation facilities and gathering spaces.Services provided by the firm induded design and permitting for utility improvements,water,sewer, <br /> drainage.Permitting was coordinated with WASD,DERM and FDEP.Grading and paving elements associated with the expansion project are also part of the scope of work.In addition, <br /> subsurface utility engineering(SUE),construction observation and administration services were provided. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> 1 Miami Children's Hospital(MCH)/Nicklaus Children's Hospital Bed PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Tower Expansion 2016 Applicable) <br /> Miami, FL 2016 <br /> c. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Engineer.Subconsultant for the design of this LEED Silver six-story 180,000 SF hospital building addition with related support facilities. Provided civil engineering services <br /> including design,permit coordination and construction observation. The design induded demolition,paving,grading,drainage,water,sewer conveyance system and sewer lift station, <br /> signing and marking,and pollution preventions plans for the building addition and an adjacent pedestrian"Paseo" Surveying services induded sketch and legal descriptions and FEMA <br /> elevation certificates. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City of Miami Design/Build Moore Park PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Miami, FL 2014 Applicable) <br /> 2014 <br /> 1 d. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Engineer.This design/build project involved the renovation of a portion of the existing Moore Park(original home of the historic Orange Bowl stadium)which induded a new <br /> TEED Gold community center building and daycare building,new basketball courts,a new park green area with pavilions and the associated pathway and parking/driveway areas. The <br /> site is located at the northeast corner of NW 10th Avenue and NW 36th Street in the City of Miami.Services provided by Miller Legg induded civil engineering design(induding <br /> sstormwater drainage and sanitary sewer system design),regulatory agency permitting and construction administration services. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Miami-Dade College(MDC) Medical Campus Center for Learning, PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Innovation&Simulation Ongoing Applicable) <br /> Miami, FL <br /> e. <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Engineer.Miller Legg is providing a full suite of civil engineering services for the Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. <br /> Miller Legg s scope of services for the new building spans preliminary site engineering/analysis through site civil and utility infrastructure design development and construction <br /> 1 documentation,to construction observation and doseout. In addition,the firm is furnishing full civil services associated with the demolition of a 1-story building to make way for the <br /> new construction.Miller Legg will also prepare LEED exhibits and calculations related to the engineering design effort for the project for a Silver level application. <br /> STANDARD FORM 330(REV.8/2016)PAGE 2 <br /> 1 <br /> MILLER 'LEGG <br /> SONG +ASSOCIATES 27 <br /> I <br />