Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />12  <br />01C032018D  <br />  <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  <br />(Complete one Section E for each key person.)  <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  <br />Douglas W. Mann, PE, DCE  Senior Coastal Engineer a. Total 31  b. With Current Firm 31  <br />15. FIRM NAME AND LOCATION (City and State)  <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  <br />MS/Coastal Engineering, University of Florida/1987  <br />BCE/Civil Engineering, University of Delaware/1985  <br />Professional Engineer, Civil Engineering: FL, DE, LA, MA  <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  <br />Academy of Coastal Ocean, Port, and Navigation Engineers, American Society of Civil Engineers, ASCE‐ACOPNE  <br />Diplomate of Coastal Engineering, Florida Shore and Beach Preservation Association, American Shore and Beach  <br />Preservation Association, Florida Shore & Beach Preservation Association, Per Bruun Distinguished Service Award for  <br />excellence in all aspects of coastal engineering, 2017.  <br />19. RELEVANT PROJECTS  <br />a.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Storm Berm Nourishment – City of Deerfield Beach  <br />City of Deerfield Beach, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2016  2005‐2006  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Mann contributed to the coastal engineering permitting and design services for a beach nourishment project  <br />along the shoreline damaged by Hurricane Matthew. Services provided include geotechnical testing of native and fill  <br />sands, preliminary design, and submittal of an FDEP Coastal Construction Control Line (CCCL) permit application,   <br />with recent permit issuance to help the City with a proactive mechanism to nourish their shoreline before and after  <br />a storm.  <br />b.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Summary Planning Document for the Pinellas County Coastal  <br />Management Program, Pinellas County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2010‐2011  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Mann provided content and review for the Summary Planning Document for the Pinellas Coastal Management  <br />Program which details various aspects of the County’s Coastal Management Program (CMP), including its history,  <br />program elements, funding needs for the next six years (FY 2012‐2017), and long term planning milestones through  <br />FY 2021.  <br />c.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Anna Maria Island Shore Protection Program   <br />Manatee County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2001‐present  2002, 2005‐2006, 2011  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Mann has assisted with various projects within Manatee County throughout his career. Mr. Mann worked as  <br />engineer and principal author of the Limited Revaluation Report for the first renourishment of the Manatee County  <br />shoreline. Performed economic analyses, littoral budget development, cost estimates, beach fill design, and detailed  <br />initial project review. (2002). Since that time he has assisted with the 2006 Anna Maria Island Feasibility Study and  <br />review and QA/QC support for the 2011 Longboat Pass geotextile groin placement and design and permitting for the  <br />removal of the Cortez Groins and replacement with Permeable Adjustable Groins constructed in 2014.  <br />