|
City of Sunny Isles Beach, Florida
<br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01
<br />
<br />
<br />Aptim Environmental & Infrastructure, Inc.
<br />12
<br />01C032018D
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />Douglas W. Mann, PE, DCE Senior Coastal Engineer a. Total 31 b. With Current Firm 31
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />MS/Coastal Engineering, University of Florida/1987
<br />BCE/Civil Engineering, University of Delaware/1985
<br />Professional Engineer, Civil Engineering: FL, DE, LA, MA
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Academy of Coastal Ocean, Port, and Navigation Engineers, American Society of Civil Engineers, ASCE‐ACOPNE
<br />Diplomate of Coastal Engineering, Florida Shore and Beach Preservation Association, American Shore and Beach
<br />Preservation Association, Florida Shore & Beach Preservation Association, Per Bruun Distinguished Service Award for
<br />excellence in all aspects of coastal engineering, 2017.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Storm Berm Nourishment – City of Deerfield Beach
<br />City of Deerfield Beach, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />applicable)
<br />2016 2005‐2006
<br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Mann contributed to the coastal engineering permitting and design services for a beach nourishment project
<br />along the shoreline damaged by Hurricane Matthew. Services provided include geotechnical testing of native and fill
<br />sands, preliminary design, and submittal of an FDEP Coastal Construction Control Line (CCCL) permit application,
<br />with recent permit issuance to help the City with a proactive mechanism to nourish their shoreline before and after
<br />a storm.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Summary Planning Document for the Pinellas County Coastal
<br />Management Program, Pinellas County, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />applicable)
<br />2010‐2011 N/A
<br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Mann provided content and review for the Summary Planning Document for the Pinellas Coastal Management
<br />Program which details various aspects of the County’s Coastal Management Program (CMP), including its history,
<br />program elements, funding needs for the next six years (FY 2012‐2017), and long term planning milestones through
<br />FY 2021.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Anna Maria Island Shore Protection Program
<br />Manatee County, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />applicable)
<br />2001‐present 2002, 2005‐2006, 2011
<br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Mann has assisted with various projects within Manatee County throughout his career. Mr. Mann worked as
<br />engineer and principal author of the Limited Revaluation Report for the first renourishment of the Manatee County
<br />shoreline. Performed economic analyses, littoral budget development, cost estimates, beach fill design, and detailed
<br />initial project review. (2002). Since that time he has assisted with the 2006 Anna Maria Island Feasibility Study and
<br />review and QA/QC support for the 2011 Longboat Pass geotextile groin placement and design and permitting for the
<br />removal of the Cortez Groins and replacement with Permeable Adjustable Groins constructed in 2014.
<br />
|