My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />13 <br />01C032018D <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) SECTION F PROJECT #5 (2) YEAR COMPLETED <br />Longboat Key Comprehensive Erosion Control Program <br />Longboat Key, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />1995‐present 1996/97, 2001, 2003, <br />2005/06, 2010, 2011 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Mann works as the Project Manager and Senior Coastal Engineer for all aspects of the Longboat Key Erosion <br />Control Program. Mr. Mann has recently worked as co‐project manager and engineer for the evaluation of inlet <br />processes and feasibility study of alternatives to improve sand retainage on the shorelines adjacent to Longboat <br />Pass. Mr. Mann designed, permitted and assisted with construction phase services for two permeable adjustable <br />groins to stabilize a long‐standing erosion hot spot fronting the Islander Condominium. Additionally, Mr. Mann was <br />the Project Manager and Engineer of Record for two permeable adjustable groins, a terminal groin, and a small <br />truck fill to stabilize the shoreline adjacent to Longboat Pass. Mr. Mann also served as the Project Manager and <br />Engineer of Record for the implementation of an emergency nourishment of the northern mile of the Town’s beach. <br />APTIM provided construction engineering services to the Town including a detailed sand quality control and quality <br />assurance program <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Curtis Park Boat Ramp Improvements <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2013‐2017 2017 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Mr. Mann design and permitted boat ramp improvements to Curtis Park, which included replacement of a decayed <br />wood dock, addition of a new center marginal dock to assist in boat launching, repair to the existing boat ramp, <br />replacement of wooden dolphin piles, replacement of a failed concrete bag revetment develop a soil management <br />plan, provide for stormwater treatment, and parking lot expansion. Obtained SFWMD, USACE, and DRER permits. <br />f.. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDEP Coastal Construction Control Line Permitting Services <br />Within Palm Beach, Broward and Miami Dade County <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />1992‐current N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Mr. Mann has obtained approximately 75 Coastal Construction Control permits for various public and private clients <br />who wish to responsibly develop and improve the coast of south Florida. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Upham Beach Stabilization Project <br />Pinellas County, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2002‐present 2005‐2006 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Mann designed and permitted a stacked geotube T‐head groin system to achieve an increased beach <br />nourishment interval. The project included an assessment of the sediment budget to avoid downdrift impacts (2002‐ <br />2003). Mr. Mann was the Engineer of Record for the 2005‐2006 construction of the geotextile tube groin field. <br />Additionally, Mr. Mann served as Engineer‐of‐Record for the 2011 geotextile tube repair project. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.