My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />24 <br />01C032018D <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />Jason Whitman, PG Environmental Engineer a. Total 21 b. With Current Firm 18 <br />15. FIRM NAME AND LOCATION (City and State) <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />MS/Geology/Florida Atlantic University/1999 <br />BS/Geology/Florida Atlantic University/1997 <br />Professional Geologist, Florida PG2379; 2005 <br />Certified Hazardous Materials Manager, 12170 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As a senior hydrogeologist, Mr. Whitman has utilized his technical expertise to delineate contaminant plumes, evaluate <br />contaminant pathway migration patterns, and design and installation of groundwater remediation systems. He is well <br />versed in the application of federal, state, and local environmental regulations. During his graduate studies he worked <br />with Dr. Jorge Restrepo to develop a MODFLOW computer model to replicate the process of evapotranspiration for the <br />SFWMD. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SFRTA/TRI‐RAIL – FDOT Miami Railyard, West Palm Beach Layover <br />Facility, and the full 72‐mile rail corridor, Dade, Broward & Palm Beach <br />Counties, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br /> N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager ‐ Manages the full‐time Operation and Maintenance of the onsite Water Treatment Plant <br />responsible for treating all Industrial Process Water and Stormwater generated at the FDOT Miami Railyard, <br />oversees environmental compliance by all Users of the South Florida Rail Corridor (SFRC), performs ACM & Pb <br />inspections on Facilities, prepares and maintains SWPPP and SPCC plans, and audits all Users of the SFRC. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Scott Homes – Sectors I ‐ IV, Opa Locka, Florida PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br /> N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager ‐ Managed the assessment and remediation of a former dump site located adjacent to the Gwen <br />Cherry landfill for residential development with lead contamination present at hazardous levels in accordance with <br />Chapter 24 under former DERM contract. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami International Airport, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br /> N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager ‐ Managed the development of a remedial action plan, aquifer test, and pilot test project for a <br />former military cargo area (Bldg. 2129) that was impacted by chlorinated solvents for review by DERM. Managed the <br />assessment and transportation and disposal of petroleum contaminated soil from construction activities at MIA <br />related to both North and South Terminal construction activities for FDEP. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.