Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />25  <br />01C032018D  <br />  <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  <br />(Complete one Section E for each key person.)  <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  <br />Lauren Floyd, MS  Senior Marine Biologist a. Total 20  b. With Current Firm 11  <br />15. FIRM NAME AND LOCATION (City and State)  <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  <br />MS/Marine Biology/Coastal Zone Management, Nova  <br />Southeastern University/2006  <br />BS/Middlebury College/1997  <br />  <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  <br />BOEM Protected Species Observer; PADI (Divemaster, Rescue Diver, Advanced Diver, Enriched Air Nitrox Diver, Dry Suit  <br />Specialty; Diver); DAN O2 Administration Certification; Member: FSBPA, ASBPA, FAEP, NAEP  <br />19. RELEVANT PROJECTS  <br />a.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Broward County Shore Protection Project, Segments II and III  <br />Broward County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2003‐on‐going  2005‐2006  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br /> Ms. Floyd was project biologist for the Broward County Shore Protection Project. At APTIM, she worked on this  <br />project during the post‐construction phase of monitoring. She led field investigations and conducted monitoring on  <br />both the nearshore hardbottom and the artificial reef. She also assisted with ESA Section 7 Consultation and  <br />contributed to the preparation of an EA for NEPA compliance.  <br />b.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Anna Maria Island Shore Protection Program  <br />Manatee County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2006‐present  2005‐2006, 2011, 2014  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Ms. Floyd has managed environmental services for coastal projects along Anna Maria Island since 2006. She  <br />managed all post‐construction hardbottom and artificial reef surveys, environmental data analysis and report  <br />preparation for the 2005/2006 Anna Maria Island Storm Repair Project and was responsible for all environmental  <br />permitting, agency coordination, UMAM preparation, development and implementation of environmental  <br />monitoring plan and environmental reporting for the 2011 Coquina Beach and City of Anna Maria Beach  <br />Nourishment Projects. She also assisted with the design, construction observation and monitoring of the mitigative  <br />artificial reef built to mitigate for anticipated impacts from the Coquina Beach nourishment. Ms. Floyd prepared the  <br />Environmental Assessment for the 2013/2014/2015 Central Beach Nourishment Project in compliance with National  <br />Environmental Policy Act (NEPA) requirements.  <br />c.  <br />(1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  <br />Collier County Beach Nourishment  <br />Collier County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2006‐present  2006, 2010, 2011,  <br />2012, 2013‐14, 2015,  <br />2016  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Ms. Floyd has assisted Collier County with agency coordination, permitting, development of environmental  <br />monitoring plans, coordination and implementation of field activities, data analysis, and report preparation. She has  <br />performed biological surveys of natural hardbottom and artificial reef habitats including in situ identification and  <br />abundance of flora and fauna in support of the Collier County Beach Nourishment Projects. She has also prepared  <br />environmental documents in support of National Environmental Policy Act, Endangered Species Act Section 7  <br />Consultation, and Magnuson‐Stevens Fishery Conservation and Management Act in support of the beach  <br />nourishment projects.