My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />32 <br />01C032018D <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami‐Dade Public Works Julia Tuttle Survey; Miami‐Dade, Florida PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2014 N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Surveyor ‐ Miami‐Dade Public Works contracted with APTIM to provide a hydrographic survey of the navigation <br />channel along the Julia Tuttle Causeway. APTIM used RTK GPS to conduct survey control reconnaissance before field <br />activities began. We combined single‐beam sonar data with RTK GPS and heave, pitch and roll data to produce high <br />accuracy soundings of the navigation channel. APTIM reduced and presented all data on a final survey map. We <br />performed all work under the direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was <br />responsible for taking tide measurements using RTK GPS system as well as hydrographic survey data acquisition <br />using RTK, Motion Compensator, and Digital Echo Sounder. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.