Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />31  <br />01C032018D  <br />  <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  <br />(Complete one Section E for each key person.)  <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  <br />Christopher “Jason” Walker  Hydrographic Surveyor a. Total 5  b. With Current Firm 5  <br />15. FIRM NAME AND LOCATION (City and State)  <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  <br />MS/Geology/University of South Carolina/2011  <br />BS/Geology/University of South Carolina/2007  <br />  <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  <br />Mr. Walker has conducted numerous single beam and multi‐beam sonar surveys along the water of the southeastern  <br />U.S. and the Gulf of Mexico. He has participated in beach profile surveys; offshore borrow area surveys, and large‐scale  <br />geophysical sand searches. In addition, Mr. Walker has amble experience conducting topographic surveys with  <br />conventional survey gear as well as Real Time Kinematic Global Positioning Systems (RTK GPS). He leads data processing  <br />and reporting efforts producing permit required survey reports and maps.  <br />19. RELEVANT PROJECTS  <br />a.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />NE 16th Avenue Corridor Right‐of‐Way Verification and Topographic  <br />Survey, Miami‐Dade, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2014  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Surveyor ‐ Miami‐Dade County Public Works contracted with APTIM to provide survey services for this project. The  <br />work included verification of the NE 16th Avenue right‐of‐way as well as location of all improvements, overhead  <br />utilities, and location, inverts, and material for storm and sanitary sewers. We performed all work under the direct  <br />supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was responsible for survey data acquisition  <br />using RTK and Total Station system and assisted with data reduction and map preparation.  <br />b.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Miami‐Dade Annual Beach Profile Survey, Miami‐Dade, Florida PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2014  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Hydrographic & Topographic Surveyor ‐ APTIM has performed beach profile surveys on all of the County beaches  <br />since 2004. APTIM has performed the permit required survey several times during our time under contract with the  <br />County. APTIM utilizes state‐of‐the‐art survey technology to perform all tasks including RTK GPS, dynamic motion  <br />compensators, and highly accurate digital sounders to ensure a top quality product for the County. APTIM has  <br />performed the tasks within the allotted schedule and within budget. APTIM recently completed this survey in April  <br />2014. Surveys were conducted at each FDEP R‐monument (R‐1 to R‐113) located at approximately 1000 foot  <br />intervals throughout the project area. Additionally, we surveyed intermediate profiles from theoretical control  <br />points at the halfway point between major monuments. APTIM surveyed 154 profiles station. We performed all  <br />work under the direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker acquired all  <br />hydrographic survey data using RTK, Motion Compensator, and Digital Echo Sounder as well as topographic data  <br />collections using RTK GPS. He also assisted with data reduction and report preparation.  <br />c.  <br />(1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  <br />Broward County Mean High Water and Erosion Control Line, Broward  <br />County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2014  2011, 2015  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Associates (JV) selected APTIM to provide survey services for the 2014 mean high water survey and preparation of  <br />an erosion control line. APTIM surveyors performed the survey and prepared all required drawings, public notices,  <br />and other platting items as required by Chapter 161.141 of the Florida Statutes. We performed all work under the  <br />direct supervision of a Florida Registered Surveyor and Mapper. Mr. Walker was responsible for collection of survey  <br />data using the RTK GPS system. He also assisted with data reduction and map preparation.