Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />37  <br />01C032018D  <br />  <br />  <br />Before and after the dune repair project at Seagrape Beach (2014 and 2015).  <br />OTHER NOTABLE EFFORTS FOR THE COUNTY:  <br />• Beach Preservation Plan (BPP)  <br />In 2015, APTIM developed an update to the County’s BPP, first adopted in 1988. The BPP details the County’s strategies  <br />for the management and the long‐term sustainability of its coastline. The purpose of this update was to reevaluate the  <br />condition of the County’s coastline and identify cost effective alternatives to maintain and improve its sustainability. To  <br />accomplish this, the following goals were established: 1) avoid adverse impacts to environmental resources including  <br />nearshore hardbottom, 2) assess the vulnerability of upland property up to a 30‐year storm event, 3) quantify the  <br />damages due to shoreline retreat over the next 30 years, and 4) determine the recreational value of the beaches. To  <br />address these goals, APTIM completed several tasks, including updating the beach conditions by evaluating shoreline and  <br />volumetric change data and performing erosion and storm impact analyses. We also held public meetings to explain the  <br />objectives of the update to the BPP and to solicit public input into potential beach management strategies. Management  <br />strategies were developed and analyzed to identify cost effective alternatives to maintain and improve the sustainability  <br />of the County’s beaches. Additionally, APTIM identified potential funding sources and mechanisms to fund these  <br />strategies, for the County’s consideration.  <br />• Post‐Hurricane Matthew FEMA Assistance  <br />APTIM developed storm impact analysis reports for the efforts of securing FEMA Public Assistance disaster relief funding  <br />for the Sector 3 project, as well as the 2.6 miles of Sector 5 and the 2.1 miles of Sector 7. We continue to support the  <br />County with FEMA coordination, as needed.   <br />• Sector 5 Beach Restoration Design and Permitting  <br />APTIM is currently performing design and permitting services for the proposed Sector 5 Beach Restoration Project in the  <br />City of Vero Beach (R‐70 to R‐86). APTIM has developed a project feasibility study and preliminary design for the  <br />~200,000 cy project. We are currently coordinating with State and Federal permit agencies in an effort to obtain  <br />environmental permits for the project.  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />