Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />44  <br />01C032018D  <br />  <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  <br />THIS CONTRACT  <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  <br />20. EXAMPLE PROJECT  <br />KEY NUMBER  <br />6  <br />21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  <br />District‐Wide Contamination Assessment, Remediation, and  <br />Environmental Support Services – FDOT 6  <br />PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  <br />2007 ‐ Ongoing    <br />23. PROJECT OWNER’S INFORMATION  <br />a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  <br />Florida Department of Transportation  Mauricio Gomez  <br />District Contamination Impact  <br />Coordinator/Environmental Manager  <br />305‐470‐5228  <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  <br />APTIM has served FDOT‐6 on this contract for the past two consecutive contract periods since 2007. APTIM is an  <br />extension of the Department on roadway projects ranging from Level I’s and Level II Impact to Construction Assessments  <br />through utility installation and source removals. We have performed UST removals, in situ remediation, source removal  <br />including buried solid waste excavation/ segregation and removal. We have performed permitting and dewatering and  <br />treatment of millions of gallons of groundwater contaminated with Ammonia, in support of FDOT‐6 construction  <br />projects.   <br />APTIM has also become an extension to the Department by providing in‐house consultant support, plan review,  <br />management and regulatory liaison and developing alternate reuse for water and soil produced during construction  <br />activities. This has proved to be financially beneficial to the state and accelerated project timelines throughout the  <br />district. APTIM has completed surveys of bridge structures for asbestos containing materials that are proposed for  <br />renovation or demolition.  <br />State Road 826/836 Interchange, Miami, Florida   <br />The State Road 826/836 Interchange is currently under construction for road improvements in Miami. The improvements  <br />include the installation of drainage structures, construction of ramps, and 49 new bridges.   <br />APTIM continues to provide CAR services as needed during the on‐going construction for the interchange. We were first  <br />tasked during the design phase to evaluate the potential impact to construction. Areas of potential impact were  <br />identified from review of previous environmental documents and a Contamination Screening Memo provided to the  <br />Department. APTIM performed an ICA for more than 20 properties inside the project corridor. APTIM prepared  <br />environmental notes for construction plans.  <br />APTIM conducted source removals resulting in loading, transportation and disposal of approximately 10,000 tons of solid  <br />waste and 1,000 tons of arsenic impacted soil, performed closure assessment for USTs and environmental compliance  <br />oversight and attended weekly construction progress meetings. APTIM successfully implemented a plan for debris  <br />removal from excavated soil and reuse of the arsenic contaminated soil in the project corridor with a saving of over  <br />$800,000 to the Department.  <br />Miami Intermodal Center Avis Rent‐A‐Car, Miami, Florida  <br />APTIM supported the MIC team with plans review for the new tracks and East Concourse construction, permits support  <br />and environmental liaison with the Miami‐Dade Department of Health and DERM. We performed soil and groundwater  <br />assessment in former Avis and Hertz, Rinker and TriRail sites, permitting; UST and AST removal and closure; treatment of  <br />ammonia groundwater and preparation of Solid Waste Removal Plan for upcoming activities at the TriRail Station.  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant