Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />43  <br />01C032018D  <br />  <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR  <br />THIS CONTRACT  <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)  <br />20. EXAMPLE PROJECT  <br />KEY NUMBER  <br />5  <br />21. TITLE AND LOCATION (City and State) 22. YEARS COMPLETED  <br />Curtis Park Boat Ramp Improvements  <br />Miami, Florida  <br />PROFESSIONAL SERVICES  CONSTRUCTION (If applicable)  <br />2013‐2017  2017  <br />23. PROJECT OWNER’S INFORMATION  <br />a. PROJECT OWNER  b. POINT OF CONTACT NAME  c. POINT OF CONTACT TELEPHONE NUMBER  <br />City of Miami  Andre Bryan  305‐416‐1211  <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)  <br />The City of Miami is revitalizing a portion of one of their neighborhoods through improvements to Curtis Park. The City  <br />asked APTIM to design and permit improvements to the boat ramp area with the following components:  <br /> Replacement of a decayed wooden dock  <br /> Addition of a new center marginal dock to assist in boat launching  <br /> Repairs to the existing boat ramp  <br /> Replacement of wooden dolphin piles  <br /> Replacement of a failed concrete bag revetment with a concrete pile and panel bulkhead  <br /> Parking lot expansion and paving to specifically service vehicles with boat trailers  <br /> Develop a soil management plan to address historic debris buried onsite  <br /> Provide for stormwater treatment for the expanded parking lot  <br />All work was design and permitted to protect the Miami River, which is an Outstanding Florida Water. After surveying the  <br />topography and bathymetry of the site, APTIM obtained permits from the South Florida Water Management District, U.S.  <br />Army Corps of Engineers, and Miami Dade Department of Regulation and Economic Recovery to facilitate the  <br />construction. Construction was completed in 2017. The traffic flow to the ramps and the parking lot was reconfigured to  <br />meet design guidelines. The parking lot was designed to meet the Miami‐Dade County Manatee Protection Plan for the  <br />Miami River, which allowed no net increase in trailer parking within the Park.  <br />  <br />25. FIRMS INVOLVED IN THIS PROJECT  <br />a.  <br />(1) Firm Name (2) Firm Location (City and State)  Role  <br />APTIM  Boca Raton, FL  Primary consultant  <br />